My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-403
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2025 10:04:57 AM
Creation date
9/30/2015 11:28:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/20/2007
Control Number
2007-403
Agenda Item Number
11.J.2
Entity Name
Sheltra and Sons Construction
Subject
Master Planned Water Transmission Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Bid Number
2008015
Supplemental fields
SmeadsoftID
6699
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOR corrects to OWNER's satisfaction the reasons for <br />such action. <br />3.If it is subsequently determined that OWNER's <br />refusal of payment was not justified, the amount <br />wrongfully withheld shall be treated as an amount due <br />as determined by paragraph 14.02.C.1. <br />14.03 CONTRACTOR's Warranty of Title <br />A. CONTRACTOR warrants and guarantees that title to <br />all Work, materials, and equipment covered by any Application <br />for Payment, whether incorporated in the Project or not, will <br />pass to OWNER no later than the time of payment free and <br />clear of all Liens. <br />14.04 Substantial Completion <br />A. When CONTRACTOR considers the entire Work <br />ready for its intended use CONTRACTOR shall notify OWNER <br />and ENGINEER in writing that the entire Work is substantially <br />complete (except for items specifically listed by CONTRACTOR <br />as incomplete) and request that ENGINEER issue a certificate <br />of Substantial Completion. Promptly thereafter, OWNER, CON- <br />TRACTOR, and ENGINEER shall make an inspection of the <br />Work to determine the status of completion. If ENGINEER does <br />not consider the Work substantially complete, ENGINEER will <br />notify CONTRACTOR in writing giving the reasons therefore. If <br />ENGINEER considers the Work substantially complete, ENGI- <br />NEER will prepare and deliver to OWNER a tentative certificate <br />of Substantial Completion which shall fix the date of Substantial <br />Completion. There shall be attached to the certificate a <br />tentative list of items to be completed or corrected before final <br />payment. OWNER shall have seven days after receipt of the <br />tentative certificate during which to make written objection to <br />ENGINEER as to any provisions of the certificate or attached <br />list. If, after considering such objections, ENGINEER concludes <br />that the Work is not substantially complete, ENGINEER will <br />within 14 days after submission of the tentative certificate to <br />OWNER notify CONTRACTOR in writing, stating the reasons <br />therefore. If, after consideration of OWNER's objections, <br />ENGINEER considers the Work substantially complete, <br />ENGINEER will within said 14 days execute and deliver to <br />OWNER and CONTRACTOR a definitive certificate of Sub- <br />stantial Completion (with a revised tentative list of items to be <br />completed or corrected) reflecting such changes from the tenta- <br />tive certificate as ENGINEER believes justified after consider- <br />ation of any objections from OWNER. At the time of delivery of <br />the tentative certificate of Substantial Completion ENGINEER <br />will deliver to OWNER and CONTRACTOR a written <br />recommendation as to division of responsibilities pending final <br />payment between OWNER and CONTRACTOR with respect to <br />security, operation, safety, and protection of the Work, <br />maintenance, heat, utilities, insurance, and warranties and <br />guarantees. Unless OWNER and CONTRACTOR agree <br />otherwise in writing and so inform ENGINEER in writing prior to <br />ENGINEER's issuing the definitive certificate of Substantial <br />Completion, ENGINEER's aforesaid recommendation will be <br />binding on OWNER and CONTRACTOR until final payment. <br />B. OWNER <br />shall have the right <br />to exclude <br />CONTRACTOR from the Site <br />after the date <br />of Substantial <br />Completion, but <br />OWNER <br />shall allow CONTRACTOR <br />reasonable access <br />to complete <br />or correct items <br />on the tentative <br />list. <br />14.05 Partial Utilization <br />A. Use by OWNER at OWNER's option of any <br />substantially completed part of the Work which has specifically <br />been identified in the Contract Documents, or which OWNER, <br />ENGINEER, and CONTRACTOR agree constitutes a <br />separately functioning and usable part of the Work that can be <br />used by OWNER for its intended purpose without significant <br />interference with CONTRACTOR's performance of the <br />remainder of the Work, - may be accomplished prior to <br />Substantial Completion of all the Work subject to the following <br />conditions. <br />1.OWNER at any time may request CON- <br />TRACTOR in writing to permit OWNER to use any such <br />part of the Work which OWNER believes to be ready for <br />its intended use and substantially complete. If <br />CONTRACTOR agrees that such part of the Work is <br />substantially complete, CONTRACTOR will certify to <br />OWNER and ENGINEER that such part of the Work is <br />substantially complete and request ENGINEER to issue <br />a certificate of Substantial Completion for that part of the <br />Work. CONTRACTOR at any time may notify OWNER <br />and ENGINEER in writing that CONTRACTOR <br />considers any such part of the Work ready for its <br />intended use and substantially complete and request <br />ENGINEER to issue a certificate of Substantial <br />Completion for that part of the Work. Within a <br />reasonable time after either such request, OWNER, <br />CONTRACTOR, and ENGINEER shall make an <br />inspection of that part of the Work to determine its <br />status of completion. If ENGINEER does not consider <br />that part of the Work to be substantially complete, <br />ENGINEER will notify OWNER and CONTRACTOR in <br />writing giving the reasons therefore. If ENGINEER <br />considers that part of the Work to be substantially <br />complete, the provisions of paragraph 14.04 will apply <br />with respect to certification of Substantial Completion of <br />that part of the Work and the division of responsibility in <br />respect thereof and access thereto. <br />2.No occupancy or separate operation of part of <br />the Work may occur prior to compliance with the <br />requirements of paragraph 5.10 regarding property <br />insurance. <br />14.06 Final Inspection <br />A. Upon written notice from CONTRACTOR that the <br />entire Work or an agreed portion thereof is complete, <br />ENGINEER will promptly make a final inspection with OWNER <br />and CONTRACTOR and will notify CONTRACTOR in writing of <br />all particulars in which this inspection reveals that the Work is <br />incomplete or defective. CONTRACTOR shall immediately take <br />such measures as are necessary to complete such Work or <br />remedy such deficiencies. <br />14.07 Final Payment <br />A. Application for Payment <br />1.After CONTRACTOR has, in the opinion of <br />ENGINEER, satisfactorily completed all corrections <br />identified during the final inspection and has delivered, <br />in accordance with .the Contract Documents, all main- <br />tenance and operating instructions, schedules, guaran- <br />00700 General Conditions (E1CDC).doc <br />00700 - 32 <br />1:10)-02912 inch WM- Veno lake Estetesl cumentsQtepmtstaidding Contact SpmiEcationsW07WGmeral Conditions(EICDC).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.