My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-403
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2025 10:04:57 AM
Creation date
9/30/2015 11:28:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/20/2007
Control Number
2007-403
Agenda Item Number
11.J.2
Entity Name
Sheltra and Sons Construction
Subject
Master Planned Water Transmission Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Bid Number
2008015
Supplemental fields
SmeadsoftID
6699
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tees, Bonds, certificates or other evidence of insurance <br />certificates of inspection, marked -up record documents <br />(as provided in paragraph 6.12), and other documents, <br />CONTRACTOR may make application for final payment <br />following the procedure for progress payments. <br />2.The final Application for Payment shall be <br />accompanied (except as previously delivered) by: (i) all <br />documentation called for in the Contract Documents, <br />including but not limited to the evidence of insurance <br />required by subparagraph 5.04.8.7; (ii) consent of the <br />surety, if any, to final payment; and (iii) complete and <br />legally effective releases or waivers (satisfactory to <br />OWNER) of all Lien rights arising out of or Liens filed in <br />connection with the Work. <br />3.In lieu of the releases or waivers of Liens <br />specified in paragraph 14.07.A.2 and as approved by <br />OWNER, CONTRACTOR may furnish receipts or <br />releases in full and an affidavit of CONTRACTOR that: <br />(i) the releases and receipts include all labor, services, <br />material, and equipment for which a Lien could be filed; <br />and (ii) all payrolls, material and equipment bills, and <br />other indebtedness connected with the Work for which <br />OWNER or OWNER's property might in any way be <br />responsible have been paid or otherwise satisfied. If <br />any Subcontractor or Supplier fails to furnish such a <br />release or receipt in full, CONTRACTOR may furnish a <br />Bond or other collateral satisfactory to OWNER to <br />indemnify OWNER against any Lien. <br />B. Review of Application and Acceptance <br />1.If, on the basis of ENGINEER's observation of <br />the Work during construction and final inspection, and <br />ENGINEER's review of the final Application for Payment <br />and accompanying documentation as required by the <br />Contract Documents, ENGINEER is satisfied that the <br />Work has been completed and CONTRACTOR's other <br />obligations under the Contract Documents have been <br />fulfilled, ENGINEER will, within ten days after receipt of <br />the final Application for Payment, indicate in writing <br />ENGINEER's recommendation of payment and present <br />the Application for Payment to OWNER for payment. At <br />the same time ENGINEER will also give written notice <br />to OWNER and CONTRACTOR that the Work is <br />acceptable subject to the provisions of paragraph 14.09. <br />Otherwise, ENGINEER will return the Application for <br />Payment to CONTRACTOR, indicating in writing the <br />reasons for refusing to recommend final payment, in <br />which case CONTRACTOR shall make the necessary <br />corrections and resubmit the Application for Payment. <br />C. Payment Becomes Due <br />1.Thirty days after the presentation to OWNER of <br />the Application for Payment and accompanying docu- <br />mentation, the amount recommended by ENGINEER <br />will become due and, when due, will be paid by OWN- <br />ER to CONTRACTOR. <br />CONTRACTOR's final Application for Payment and <br />recommendation of ENGINEER, and without terminating the <br />Agreement, make payment of the balance due for that portion of <br />the Work fully completed and accepted. If the remaining <br />balance to be held by OWNER for Work not fully completed or <br />corrected is less than the retainage stipulated in the Agreement, <br />and if Bonds have been furnished as required in paragraph <br />5.01, the written consent of the surety to the payment of the <br />balance due for that portion of the Work fully completed and <br />accepted shall be submitted by CONTRACTOR to ENGINEER <br />with the Application for such payment. Such payment shall be <br />made under the terms and conditions governing final payment, <br />except that it shall not constitute a waiver of Claims. <br />14.09 Waiver of Claims <br />A. The making and acceptance of final payment will <br />constitute: <br />t.a waiver of all Claims by OWNER against <br />CONTRACTOR, except Claims arising from unsettled <br />Liens, from defective Work appearing after final <br />inspection pursuant to paragraph 14.06, from failure to <br />comply with the Contract Documents or the terms of any <br />special guarantees specified therein, or from <br />CONTRACTOR's continuing obligations under the <br />Contract Documents; and <br />2.a waiver of all Claims by CONTRACTOR against <br />OWNER other than those previously made in writing <br />which are still unsettled. <br />ARTICLE 15 - SUSPENSION OF WORK AND <br />TERMINATION <br />15.01 OWNER May Suspend Work <br />A. At anytime and without cause, OWNER may suspend <br />the Work or any portion thereof for a period of not more than 90 <br />consecutive days by notice in writing to CONTRACTOR and <br />ENGINEER which will fix the date on which Work will be <br />resumed. CONTRACTOR shall resume the Work on the date <br />so fixed. CONTRACTOR shall be allowed an adjustment in the <br />Contract Price or an extension of the Contract Times, or both, <br />directly attributable to any such suspension if CONTRACTOR <br />makes a Claim therefore as provided in paragraph 10.05. <br />15.02 OWNER May Terminate for Cause <br />A. <br />The occurrence of any one <br />or more of <br />the following <br />events <br />will justify termination for cause: <br />1. CONTRACTOR's persistent failure to perform <br />the Work in accordance with the Contract Documents <br />(including, but not limited to, failure to supply sufficient <br />skilled workers or suitable materials or equipment or <br />failure to adhere to the progress schedule established <br />under paragraph 2:07 as adjusted from time to time <br />pursuant to paragraph 6.04); <br />14.08 Final Completion Delayed <br />2. CONTRACTOR'S disregard of Laws or Regula - <br />A. If, through no fault of CONTRACTOR, final tions of any public body having jurisdiction; <br />completion of the Work is significantly delayed, and if <br />ENGINEER so confirms, OWNER shall, upon receipt of <br />00700 General Conditions (E1CDC).doc <br />00700-33 <br />J N07-029 12 Inch W M - wem lake Convact Spmification900700 General Conditions WCDC).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.