Laserfiche WebLink
4 . 03 of the General Conditions . <br /> 4 . 5 Before submitting a Bid , each Bidder will , at Bidder's own expense , make <br /> or obtain any additional examinations , investigations , explorations , tests , <br /> and studies , and obtain any additional information and data which pertain <br /> to the physical conditions (surface , subsurface and underground facilities ) <br /> at or contiguous to the site or otherwise which may affect cost, progress , <br /> performance , or furnishing of the work and which Bidder deems necessary <br /> to determine its Bid for performing and furnishing the work in accordance <br /> with the time , price and other terms and conditions of the Contract <br /> Documents . <br /> 4 . 6 On request in advance , Owner will provide each Bidder access to the site <br /> to conduct such explorations and tests as each Bidder deems necessary <br /> for submission of a Bid . Bidder shall fill all holes , clean up , and restore the <br /> site to its former condition upon completion of such explorations . <br /> 4 . 7 The lands upon which the work is to be performed , right-of-way and <br /> easements for access thereto and other lands designed for use by the <br /> Contractor in performing the work are identified in the Contract <br /> Documents . All additional lands and access thereto required for <br /> temporary construction facilities or storage of materials and equipment are <br /> to be provided by and paid for by the Contractor. Easements for <br /> permanent structures or permanent changes in existing structures are to <br /> be obtained and paid for by the Owner unless otherwise provided in the <br /> Contract Documents . <br /> 4 . 8 The submission of a Bid will constitute an incontrovertible representation <br /> by Bidder that Bidder has complied with every requirement of this Article <br /> 4 , that without exception the Bid is premised upon performing and <br /> furnishing the work required by the Contract Documents and such means , <br /> methods , techniques , sequences or procedures of construction as may be <br /> indicated in or required by the Contract Documents , and that the Contract <br /> Documents are sufficient in scope and detail to indicate and convey <br /> understanding of all terms and conditions for performance and furnishing <br /> of the work . <br /> 5. INTERPRETATIONS AND ADDENDA <br /> 5 . 1 All questions about the meanings or intent of the Contract <br /> Documents are to be directed in writing to the Purchasing <br /> Department . Interpretation or clarifications considered necessary by <br /> Owner in response to such questions will be issued by Addenda mailed or <br /> delivered to all parties recorded by Owner as having received the Bidding <br /> Documents . Questions received less than ten days prior to the date for <br /> the opening of Bids may not be answered . Only questions answered by <br /> formal written Addenda will be binding . Oral and other interpretations or <br /> clarifications will be without legal effect. <br /> 00100 Instruction To Bidders.doc <br /> 00100-3 <br /> J:\W-02912 Inch WM - Vero Lake Estates%DocumentslRep rts%Biddin9 contract Speo6cations100100 Instruction To Sidders.doc <br />