My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-403
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:06:00 PM
Creation date
9/30/2015 11:28:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/20/2007
Control Number
2007-403
Agenda Item Number
11.J.2
Entity Name
Sheltra and Sons Construction
Subject
Master Planned Water Transmission Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Bid Number
2008015
Supplemental fields
SmeadsoftID
6699
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 . 2 Addenda may also be issued to modify the Bidding Documents as <br /> deemed advisable by Owner or Engineer. <br /> 6 . BID SECURITY <br /> 6 . 1 Each Bid must be accompanied by Bid security made payable to Owner in <br /> an amount of five percent ( 5% ) of the Bidder's maximum bid price and in <br /> the form of a certified or cashier's check or a Bid Bond issued by a surety <br /> meeting the requirements of Paragraph 5 . 01 . 6 and 5 . 02 of the General <br /> Conditions . <br /> 6 . 2 The Bid security of the Successful Bidder will be retained until such Bidder <br /> has executed the Agreement and furnished the required Contract security , <br /> whereupon the Bid security will be returned . If the Successful Bidder fails <br /> to execute and deliver the Agreement and furnish the required Contract <br /> security within fifteen days after the Notice of Award , Owner may annul <br /> the Notice of Award , and the Bid security of that Bidder shall be retained <br /> by Owner not as a penalty but as liquidated damages . <br /> The Bid security of other Bidders whom Owner believes to have a <br /> reasonable chance of receiving the award may be retained by the Owner <br /> until the earlier of the seventh day after the effective date of the <br /> Agreement or the sixty-first day after the Bid opening , whereupon Bid <br /> security furnished by such Bidders will be returned . Bid security with bids <br /> which are not competitive may be returned before the end of the sixty-day <br /> period . <br /> 7 . CONTRACT TIME <br /> The number of days within which , or dates by which , the work is to be <br /> substantially completed and also complete and ready for final payment (the <br /> Contract Time ) are set forth in the Bid Form and the Agreement . <br /> 8 . LIQUIDATED DAMAGES <br /> Provisions for liquidated damages , if any, are set forth in the Agreement. <br /> 9. SUBSTITUTE OR "OR EQUAL" ITEMS <br /> The Contract , if awarded , will be on the basis of materials and equipment <br /> described in the Drawings or specified in the Specifications without consideration <br /> of possible substitute or "or equal" items . Whenever it is indicated in the <br /> Drawings or specified in the Specifications that a substitute or "or equal " item of <br /> material or equipment may be furnished or used by Contractor if acceptable to <br /> Engineer, application for such acceptance will not be considered by Engineer <br /> until after the Effective Date of the Agreement . The procedure for submission of <br /> any such application by Contractor and consideration by Engineer is set forth in <br /> 00100 Instruction To Bidders.doc <br /> 001004 <br /> Jd07-029 121nch WM - Vero Lake Estates\Docunnents\Reportsl8iddin9 Contract Specifirafions\0010O Instruction To Sidders.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.