SECTION 01025
<br />MEASUREMENT AND PAYMENT
<br />PART 1 —GENERAL
<br />1.01 GENERAL
<br />Measurement and payment will be based upon work completed and accepted
<br />in accordance with the Contract Documents. No separate payment will be
<br />made for excavation, trenching, dewatering, backfilling, leakage tests,
<br />surveying, density tests, or other incidental items of work not shown in the
<br />Agreement.
<br />1.02 EQUIPMENT AND MATERIALS IN STORAGE
<br />100,000
<br />31000
<br />100,000
<br />Partial payment for materials and equipment in
<br />proper storage at the
<br />site of
<br />the work or other approved storage site will be made
<br />303000
<br />for those items for
<br />which
<br />the Contractor has submitted paid invoices to
<br />the
<br />Engineer. The
<br />partial
<br />payment for stored materials will be 50% of
<br />the
<br />value of materials
<br />and
<br />equipment, based on receipted bills, furnished
<br />but
<br />not incorporated
<br />in the
<br />work, as determined by Engineer.
<br />6,000,000
<br />7,0003000
<br />175,000
<br />1.03 MEASUREMENT
<br />A. Mobilization: Measurement shall be on a lump sum basis, and shall be
<br />limited to the following maximum amounts:
<br />ORIGINAL CONTRACT AMOUNT ($) MAXIMUM AMOUNT OF
<br />FROM MORE THAN TO AND INCLUDING ITEM FOR MOBILIZATION
<br />0
<br />100,000
<br />31000
<br />100,000
<br />500,000
<br />15,000
<br />5003000
<br />130007000
<br />303000
<br />1,000,000
<br />2,000,000
<br />603000
<br />2,000,000
<br />37000,000
<br />90,000
<br />33000,000
<br />410002000
<br />120,000
<br />49000,000
<br />510007000
<br />125,000
<br />57000,000
<br />61000,000
<br />150,000
<br />6,000,000
<br />7,0003000
<br />175,000
<br />7,000,000
<br />10,000,000
<br />200,000
<br />10,000,000
<br />-------------
<br />250,000
<br />Should the lump sum price bid for the item Mobilization exceed the maximum
<br />permissible amount for this item, as specified herein, the bid price will be
<br />reduced to the maximum permissible amount, and the reduced price will be
<br />used in correctly determining the total price for comparison of bids received.
<br />The cost of video taping the pre -construction condition shall be included in
<br />the lump -sum cost of mobilization.
<br />B. Pipe: Measurement
<br />of pipe shall be computed using linear feet,
<br />as measured
<br />along the centerline
<br />of the pipe
<br />installed (Except when included
<br />in lump sum
<br />bid items -ie; Aerial
<br />crossing).
<br />No deduction will be made for
<br />the length of
<br />01025 Measurement and Payment.doc
<br />01025-1
<br />J9074)29 121ncfi WM- Vem Lake Estates\BocumentsNReperts\Balding Contrad SpecificahonsW1025 Measurement and Payment.doc
<br />
|