SECTION 01025 <br /> MEASUREMENT AND PAYMENT <br /> PART 1 — GENERAL <br /> 1 . 01 GENERAL <br /> Measurement and payment will be based upon work completed and accepted <br /> in accordance with the Contract Documents . No separate payment will be <br /> made for excavation , trenching , dewatering , backfilling , leakage tests , <br /> surveying , density tests , or other incidental items of work not shown in the <br /> Agreement. <br /> 1 .02 EQUIPMENT AND MATERIALS IN STORAGE <br /> Partial payment for materials and equipment in proper storage at the site of <br /> the work or other approved storage site will be made for those items for which <br /> the Contractor has submitted paid invoices to the Engineer. The partial <br /> payment for stored materials will be 50% of the value of materials and <br /> equipment, based on receipted bills , furnished but not incorporated in the <br /> work, as determined by Engineer. <br /> 1 .03 MEASUREMENT <br /> A. Mobilization : Measurement shall be on a lump sum basis , and shall be <br /> limited to the following maximum amounts : <br /> ORIGINAL CONTRACT AMOUNT ($) MAXIMUM AMOUNT OF <br /> FROM MORE THAN TO AND INCLUDING ITEM FOR MOBILIZATION <br /> 0 100 , 000 31000 <br /> 100 , 000 500 , 000 15 , 000 <br /> 5003000 130007000 303000 <br /> 1 ,000 ,000 2 ,000 ,000 603000 <br /> 2 , 000 ,000 37000 , 000 90, 000 <br /> 33000 , 000 410002000 120 , 000 <br /> 49000 , 000 510007000 125 ,000 <br /> 57000 ,000 61000 , 000 150 ,000 <br /> 6 , 000 ,000 7 ,0003000 175 ,000 <br /> 71000 , 000 10 ,000 , 000 200 ,000 <br /> 10 , 000 , 000 ------------- 250 ,000 <br /> Should the lump sum price bid for the item Mobilization exceed the maximum <br /> permissible amount for this item , as specified herein , the bid price will be <br /> reduced to the maximum permissible amount, and the reduced price will be <br /> used in correctly determining the total price for comparison of bids received . <br /> The cost of video taping the pre-construction condition shall be included in <br /> the lump-sum cost of mobilization . <br /> B . Pipe : Measurement of pipe shall be computed using linear feet, as measured <br /> along the centerline of the pipe installed ( Except when included in lump sum <br /> bid items-ie ; Aerial crossing ) . No deduction will be made for the length of <br /> 01025 Measurement and Payment.doc <br /> 01025- 1 <br /> J1074)29 121ncfi WM - Vem Lake Estates\BocumentsNReperts\Balding Contrad SpecificahonsW1025 Measurement and Payment.doc <br />