My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-403
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:06:00 PM
Creation date
9/30/2015 11:28:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/20/2007
Control Number
2007-403
Agenda Item Number
11.J.2
Entity Name
Sheltra and Sons Construction
Subject
Master Planned Water Transmission Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Bid Number
2008015
Supplemental fields
SmeadsoftID
6699
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01025 <br /> MEASUREMENT AND PAYMENT <br /> PART 1 — GENERAL <br /> 1 . 01 GENERAL <br /> Measurement and payment will be based upon work completed and accepted <br /> in accordance with the Contract Documents . No separate payment will be <br /> made for excavation , trenching , dewatering , backfilling , leakage tests , <br /> surveying , density tests , or other incidental items of work not shown in the <br /> Agreement. <br /> 1 .02 EQUIPMENT AND MATERIALS IN STORAGE <br /> Partial payment for materials and equipment in proper storage at the site of <br /> the work or other approved storage site will be made for those items for which <br /> the Contractor has submitted paid invoices to the Engineer. The partial <br /> payment for stored materials will be 50% of the value of materials and <br /> equipment, based on receipted bills , furnished but not incorporated in the <br /> work, as determined by Engineer. <br /> 1 .03 MEASUREMENT <br /> A. Mobilization : Measurement shall be on a lump sum basis , and shall be <br /> limited to the following maximum amounts : <br /> ORIGINAL CONTRACT AMOUNT ($) MAXIMUM AMOUNT OF <br /> FROM MORE THAN TO AND INCLUDING ITEM FOR MOBILIZATION <br /> 0 100 , 000 31000 <br /> 100 , 000 500 , 000 15 , 000 <br /> 5003000 130007000 303000 <br /> 1 ,000 ,000 2 ,000 ,000 603000 <br /> 2 , 000 ,000 37000 , 000 90, 000 <br /> 33000 , 000 410002000 120 , 000 <br /> 49000 , 000 510007000 125 ,000 <br /> 57000 ,000 61000 , 000 150 ,000 <br /> 6 , 000 ,000 7 ,0003000 175 ,000 <br /> 71000 , 000 10 ,000 , 000 200 ,000 <br /> 10 , 000 , 000 ------------- 250 ,000 <br /> Should the lump sum price bid for the item Mobilization exceed the maximum <br /> permissible amount for this item , as specified herein , the bid price will be <br /> reduced to the maximum permissible amount, and the reduced price will be <br /> used in correctly determining the total price for comparison of bids received . <br /> The cost of video taping the pre-construction condition shall be included in <br /> the lump-sum cost of mobilization . <br /> B . Pipe : Measurement of pipe shall be computed using linear feet, as measured <br /> along the centerline of the pipe installed ( Except when included in lump sum <br /> bid items-ie ; Aerial crossing ) . No deduction will be made for the length of <br /> 01025 Measurement and Payment.doc <br /> 01025- 1 <br /> J1074)29 121ncfi WM - Vem Lake Estates\BocumentsNReperts\Balding Contrad SpecificahonsW1025 Measurement and Payment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.