SECTION 01025 <br />MEASUREMENT AND PAYMENT <br />PART 1 —GENERAL <br />1.01 GENERAL <br />Measurement and payment will be based upon work completed and accepted <br />in accordance with the Contract Documents. No separate payment will be <br />made for excavation, trenching, dewatering, backfilling, leakage tests, <br />surveying, density tests, or other incidental items of work not shown in the <br />Agreement. <br />1.02 EQUIPMENT AND MATERIALS IN STORAGE <br />100,000 <br />31000 <br />100,000 <br />Partial payment for materials and equipment in <br />proper storage at the <br />site of <br />the work or other approved storage site will be made <br />303000 <br />for those items for <br />which <br />the Contractor has submitted paid invoices to <br />the <br />Engineer. The <br />partial <br />payment for stored materials will be 50% of <br />the <br />value of materials <br />and <br />equipment, based on receipted bills, furnished <br />but <br />not incorporated <br />in the <br />work, as determined by Engineer. <br />6,000,000 <br />7,0003000 <br />175,000 <br />1.03 MEASUREMENT <br />A. Mobilization: Measurement shall be on a lump sum basis, and shall be <br />limited to the following maximum amounts: <br />ORIGINAL CONTRACT AMOUNT ($) MAXIMUM AMOUNT OF <br />FROM MORE THAN TO AND INCLUDING ITEM FOR MOBILIZATION <br />0 <br />100,000 <br />31000 <br />100,000 <br />500,000 <br />15,000 <br />5003000 <br />130007000 <br />303000 <br />1,000,000 <br />2,000,000 <br />603000 <br />2,000,000 <br />37000,000 <br />90,000 <br />33000,000 <br />410002000 <br />120,000 <br />49000,000 <br />510007000 <br />125,000 <br />57000,000 <br />61000,000 <br />150,000 <br />6,000,000 <br />7,0003000 <br />175,000 <br />7,000,000 <br />10,000,000 <br />200,000 <br />10,000,000 <br />------------- <br />250,000 <br />Should the lump sum price bid for the item Mobilization exceed the maximum <br />permissible amount for this item, as specified herein, the bid price will be <br />reduced to the maximum permissible amount, and the reduced price will be <br />used in correctly determining the total price for comparison of bids received. <br />The cost of video taping the pre -construction condition shall be included in <br />the lump -sum cost of mobilization. <br />B. Pipe: Measurement <br />of pipe shall be computed using linear feet, <br />as measured <br />along the centerline <br />of the pipe <br />installed (Except when included <br />in lump sum <br />bid items -ie; Aerial <br />crossing). <br />No deduction will be made for <br />the length of <br />01025 Measurement and Payment.doc <br />01025-1 <br />J9074)29 121ncfi WM- Vem Lake Estates\BocumentsNReperts\Balding Contrad SpecificahonsW1025 Measurement and Payment.doc <br />