valves and fittings installed in the line. Where the measurement terminates at
<br />a valve, bend, tee, or other fitting, the centerline of the valve or fitting shall be
<br />the point of termination. All required clearing, excavation, backfill,
<br />compaction, all restoration and replacement, paving, grading, density testing,
<br />pressure and BAC -T testing, pipe lining, coating, encasement material,
<br />restraining devices, and all mechanical joint fittings and thrust blocks shall be
<br />included in the cost of the pipe.
<br />C. Fittings: The cost of all cast iron and ductile iron fittings and bolts, glands,
<br />etc., shall be included in the cost of the pipe.
<br />D. Gate Valves, air release valves, Tapping Sleeve and Valves and other
<br />miscellaneous appurtenances: Measurement shall be on the basis of
<br />furnishing and installing each type and size of appurtenance required,
<br />including valve boxes, covers, and other associated items. (Except when
<br />included in lump sum bid items — eg; aerial crossing, directional bore, fire
<br />hydrant assembly.)
<br />E. HDPE Horizontal Directional Bore: Measurement of HDPE horizontal
<br />directional bore shall be computed using linear feet, as measured prior to
<br />pulling, and deducting the length of pipe above ground service and include all
<br />material (including HDPE pipe), equipment, supplies, fuel, labor, sheeting and
<br />bracing, receiving and boring pits (if required), excavation, dewatering,
<br />backfilling, compaction, mechanical fittings, restoration, furnishing and in
<br />stallion of the HDPE pipe. Payments shall be based on a linear foot price for
<br />the directional bore length as measured as specified above.
<br />F. Fire Hydrant Assembly: Measurement of fire hydrant assembly shall be for
<br />the actual number constructed in accordance with the Plans and
<br />Specifications, or as directed by the Engineer, at the unit price bid for the item
<br />"Fire Hydrant Assembly," scheduled in the Form of Proposal. The unit price
<br />for "Fire Hydrant Assembly" shall include cutting bituminous paving, removal
<br />of paving courses and curb if required, excavations, furnishing and
<br />installation of 10' ± (6") D.I.P. water main, dry -barrel traffic hydrant, concrete
<br />foundations for hydrant, fittings, one (1) 6" diameter gate valve, concrete
<br />thrust block (reaction backing) for fire hydrant, backfill, minor swale or
<br />shoulder right-of-way grading and sodding (per plans), blue reflective
<br />markers, all materials, equipment, labor and all else necessary therefore and
<br />incidental thereto.
<br />G. Water Service: Measurement of water service lateral shall include furnishing
<br />and construction of piping and appurtenances to carry and distribute water
<br />from the water main to the edge of the Right -of -Way for future service to
<br />individual property owners. The work shall include, but shall not be limited to,
<br />cutting of existing pavement where required, jack and bore of existing
<br />pavement where required, excavation, installation (of pipe, meter boxes,
<br />connections and associated appurtenances), backfilling, testing, disinfection,
<br />and all restoration in kind. The services shall be of a type and size specified,
<br />and shall be constructed in accordance with these Plans and Specification, or
<br />as directed by the Engineer.
<br />01025 Measurement and Payment.doc
<br />01025-2
<br />Ji07-02912 Inch WM - Vero Lake Estates%DccumentsV2ewrts%E idling Contract SpecificationsW1025 Measurement and Payment.doc