H . Driveway Bore : Measurement of Driveway Bore shall include equipment, <br /> supplies , fuel , labor, sheeting and bracing , excavation , dewatering , <br /> backfilling , compaction , mechanical fittings , restoration , furnishing and <br /> installing pipe . Measurement of Driveway Bore does not include the <br /> actual pipe installed . Installed pipe quantities for Driveway Bores are <br /> covered in Section 1 .03 . 8 . Payments shall be based on the lengths specified <br /> in the Schedule of Bid Items , unless otherwise noted on the plans . <br /> Driveway Bore lengths specified in the Schedule of Bid Items are estimated <br /> quantities . Contractor will be compensated for driveway bores on a <br /> proportionate linear foot basis ( e . g . an 80 foot long bore estimated at 70 feet <br /> in the schedule of bid items will be compensated at the ratio of 8/7 times the <br /> unit price . Likewise a 60 foot long bore estimated at 70 feet in the schedule of <br /> bid items will be compensated at the ratio of 6/7 times the unit price ). Indian <br /> River County shall determine driveway bore lengths. <br /> I . Concrete Easement: Measurement of concrete for encasement shall be on <br /> the basis of the number of cubic yards of concrete installed , except that the <br /> maximum allowable quantity of concrete installed shall not exceed the values <br /> given below: <br /> Pipe Size ( Inches ) Max . Concrete for Encasement <br /> ( CY/LF of Pipe) <br /> 6 0 . 09 <br /> 8 0 . 10 <br /> t0 0 . 11 <br /> 12 0 . 12 <br /> J . Concrete Sidewalk and Driveway Replacement: Shall include sidewalk <br /> and/or driveway removed and replaced as a result of Contractor's operations . <br /> Minimum widths of replacement shall be as described in specifications or as <br /> shown on the plans. No separate payment will be made for concrete <br /> construction , including sawcutting , excavation , formwork , reinforcing , or other <br /> work or materials required in connection with concrete construction . The cost <br /> of all concrete sidewalk and driveway replacement shall be included in the <br /> cost of the pipe . <br /> K . Asphaltic Pavement Replacement: Shall include asphalt removed and <br /> replaced as a result of Contractor's operations . Minimum width of <br /> replacement shall be as described in the specifications or as shown on the <br /> plans . Work shall include sawcutting , disposal of demo 'd asphalt, and <br /> construction of the surface course , base , subgrade materials, and pavement <br /> markings, testing and all else incidental thereto. The cost of all asphaltic <br /> pavement replacement shall be included in the cost of the pipe . <br /> L. Aerial crossing : Measurement of each aerial canal/ditch crossing shall be as <br /> a lump sum and include all material ( including pipe , valves , fittings , pilings , <br /> pile caps , restraining and fastening mechanisms, etc . within limits depicted on <br /> plans), all supplies , fuel , labor, equipment, sheeting , bracing , excavation , de- <br /> watering , backfilling , compaction , restoration , grassing , rip-rap , testing , and <br /> all else incidental thereto for the complete installation of the aerial crossing . <br /> 01025 Measurement and Payment.doc <br /> 01025-3 <br /> J:\07-02912 Inch WM - Vent Lake Estatesgtocuments\Reports\Bidding Contract Spect5cations\01025 Measurement and Payment.doc <br />