M . Asphalt Pavement Overlay: Shall include all re-surfacing as a result of <br /> construction operations . Measurement and payment shall be on the basis of <br /> area , in square yards (SY) , of asphalt paved . The work shall include tack <br /> coat, surface course and pavement markings . Asphalt pavement overlay shall <br /> be included in the cost of the pipe . <br /> N . Unimproved Driveway Replacement: Shall include (dirt , marl , shell , or gravel ) <br /> driveway replacement reconstruction removed and replaced as a result of the <br /> construction operations . Work shall include subgrade and surface (shell , <br /> marl , gravel ) materials , compaction , density testing , etc. Unimproved <br /> driveway replacement shall be included in the cost of the pipe . <br /> O . Grassing : Measurement of grassing (sod ) shall be computed using the linear <br /> feet, as measured along the water main pipe , of grassed area disturbed and <br /> restored as a result of Contractor's operations . The entire width of the <br /> disturbed area shall be grassed . Payment shall include all necessary <br /> grading , soil preparation , sodding , fertilizer, mulch , and irrigation . <br /> P . Connect to exist. 20" (CR512 ) : Measurement of "Connect to exist . 20" , shall <br /> be computed as a lump sum item for all additional work required for <br /> excavation and location of existing utilities , removal of existing fittings , <br /> restraint of existing pipe and fittings , and all other incidental work required to <br /> make a connection . <br /> Q . Connect to exist. 16" ( CR510) : Measurement of "Connect to exist . 16" , shall <br /> be computed as a lump sum , for all additional work required for excavation <br /> and location of utilities , removal of existing fittings , restraint of existing pipe <br /> and fittings , and other incidental work required to make a connection . <br /> R . Construction Stake-Out: Measurement of construction stake-out shall be <br /> computed as a lump sum item , for all required construction stake-out, <br /> including : layout and survey of the proposed construction , setting of stakes as <br /> required , necessary computations to establish the exact position of the work, <br /> establish reference to baselines , and provide and maintain off-set stakes <br /> outside the limits of construction and marked to show offset distance . <br /> S . Record Drawings/As-built Survey: Measurement of record drawings/as-built <br /> survey shall be computed as a lump sum item, for the preparation of "As-built <br /> Drawings" , including field survey, drawing preparation in "ACAD " , with ties to <br /> state plan coordinates , all in accordance with IRCUDS water and wastewater <br /> utility standards . The as-built drawings shall be provided certified by a <br /> licensed and registered land surveyor. <br /> PAYMENT <br /> Payment will be made at the respective contract unit and/or lump sum price for <br /> each item shown in the Agreement, installed and accepted , which price and <br /> payment shall constitute full compensation for furnishing all materials and <br /> performing all work in connection therewith and incidental thereto . <br /> 01025 Measurement and Payment.doc <br /> 01025-0 <br /> J 109-02912Inch WM - Vero Lake Estatesll rnenisVRep ftMBldding Contact SpecRcabcnsM025 Measurement and Payment.doc <br />