Laserfiche WebLink
1 <br />• <br />0 <br />1 <br />40 <br />Hubbard -Field stability test. The asphaltic concrete mixture shall be dumped into an approved <br />mechanical spreader and immediately spread and struck off to the full width required and to <br />such an appropriate loose depth for each successive course that .when the work is completed <br />the weight of the mixture required or specific thickness per square yard will be secured. An <br />excess amount of mixture shall be carried ahead of the machine at all times. Hand raking <br />shall be done behind the machine as required. In no case shall the mixture be laid while rain] <br />is falling or when there is water on the surface to be covered. The temperature of the mix - <br />tuee at the time of spreading shall be between 250 and 340 degrees F. No skin patching shall <br />be dune. Irregularities shall be cut to the full depth of the layer and replaced with fresh <br />mixture. <br />After spreading the mixture, it shall be rolled when it has set sufficiently <br />or come to the proper condition to be rolled. Rolling shall begin at the sides and progress <br />toward the center parallel to the center line of the roadway. The roller shall be of the 5 to <br />10 ton tandem type. The motiontof the roller shall at all times be slow enough to avoid dis- <br />placement of the mixture. To prevent adhesion of the mixture to the roller, the wheels shall <br />be kept properly moistened, but an excess of water shall not be used. The mixture after <br />compaction, shall be of the thickness required in Section A. All places damaged by deposit <br />of gasoline or oil shall be removed and replaced as directed by the engineer. Longitudinal <br />joints along the center line of the pavement are permissible. <br />4. The construction and completion in a finished condition of all drainage and <br />i <br />0 drainage structures in accordance with the specifications of the County which are as follows: <br />(a) Swale ditches shall be located 42 feet center to center in 70' right of way. <br />(b) All swale ditches on both sides of all roadways shall be seeded, sprigged or <br />sodded with an approved type grass from the area within one foot of the roadway constructed fo <br />travelway outward to the top of the swale ditch on the outside, all to be done, completed and <br />finished after completion of the finished grading. <br />(c) All driveways leading from the travelway portion of any roadway shall be paved <br />or surfaced, conforming to the drainage swale profile or drainage pipe of sufficient size <br />�' which shall be placed underneath each driveway in the drainage swale to permit proper drainage.) <br />'I The minimum size of drainage pipe in a roadway Swale shall be 8 inches. <br />(d) If deep ditches are located in or alongside roadways, they shall be of a suff- <br />icient distance from the travelway portion of the road in order to maintain a natural and <br />gradual side slope and an adequate width for shoulders for the travelway. Minimum shoulder <br />width is 5 feet. <br />(e) All culverts placed under roadways shall have rip rap or concrete block head- <br />walls. All swale ditches at the intersection of deeper drainage ditches shall have a culvert <br />pipe, concrete Swale, rip rap or headwall, as the case may be, to prevent washouts and erosion. <br />Culverts in swales shall have fill over pipe stabilized or have rip rap to prevent erosion. <br />i, <br />(f) All back lot drainage ditches shall be dug with a minimum 2 foot wide bottom <br />i <br />d; and a one to one side slope. <br />r <br />i° <br />'I <br />gd <br />