My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/1/1958
CBCC
>
Meetings
>
1950's
>
1958
>
4/1/1958
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 9:40:55 AM
Creation date
6/9/2015 3:12:50 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/01/1958
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Immediately following the application of bituminous material the cover material" <br />shall be distributed uniformly over the bituminous surface by means of approved mechanical it <br />spreaders or trucks. Immediately after each application of cover material, brooming by ex- <br />perienced and skilled workmen shall be done to secure a uniform distribution which will <br />t� <br />ensure a smooth surface, Additional aggregate shall be placed by hand on any areas not pro- <br />perly covered. Immediately after spreading and dragging the cover material the entire sur- <br />face shall be rolled with a three ton to five ton steel tired roller. Rolling shall begin <br />at the adges and progress to the center of the surface, uniformly lapping each preceding track11 <br />and covering thoroughly the entire surface. The rolling shall be repeated as much as nec- <br />essary to ensure thorough keying of the cover material into the bituminous material.] <br />r <br />The second bituminous application and the second application of cover material shall�i <br />be done in a manner as described above for the first application. <br />The finished surface shall be uniform and shall conform to the lines, grades and <br />typical cross sections. <br />(e.4) Asphaltic Concrete Wearing Surface <br />This consists of the construction of an asphaltic concrete surface course <br />composed of a mixture of aggregate, mineral filler and asphalt cement, properly laid upon a <br />prepared base. The asphaltic concrete shall be in conformance with the Florida State Road <br />Department Specifications for an asphaltic concrete surface course Type II, unless otherwise <br />specified below. The thickness will be as specified in Section X -3(b), and it shall be <br />placed on a compacted base with a seal coat as specified in these regulations. Pavement thick= <br />ness more than 1/8" deficient shall not be acceptable. <br />All equipment necessary for the proper construction of this work shall be on <br />the project, in fc.rst class working condition, and shall have been approved by the engineer <br />before construction is started. <br />Before any bituminous material is applied all loose material, dust, dirt, <br />caked clay and foreign material which might prevent proper bond with the existing surface] <br />will be moved to the shoulders for the full width of the application. No bituminous material <br />shall be applied when the temperature of the air is less than 50 degrees F. or when, in the <br />s! <br />opinion of the engineer, the weather conditions or the condition of the existing surface is'I <br />unsuitable. After proper cleaning a tack coat shall be applied with a pressure distributor. i <br />The bituminous material shall be heated to a suitable consistency as designated by the eng- <br />ineer. The bituminous material shall be applied in a thin uniform layer. The rate of <br />application shall be between 0.04 to 0.08 gallons per square yard'. The exact rate shall be <br />designated by the engineer. The tack coat shall be applied sufficiently in advance of the lays <br />ing of the wearing surface to permit drying but shall not be applied so far in advance or <br />over such an area as to lose its adhesiveness as a result of being covered with dust or other <br />foreign material. The tack coat may be cut-back asphalt grade RC -1S or other approved material. <br />The tack coat -ishall be kept free from traffic until the wearing surface is laid. R <br />'r <br />The constituents of the mixture shall be combined in such proportions as to <br />produce a mixture having at least 1600 lbs. stability at 140 degrees F. as determined by the <br />1 <br />1 <br />-0 <br />1 <br />� <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.