Laserfiche WebLink
C , Calpine shall utilize a "zero liquid discharge system" to eliminate all <br /> process wastewater discharge from BHEC as set forth in Calpine ' s Site Certification Application for <br /> the Blue Heron Energy Center. <br /> d. Throughout the Term of this Agreement the County agrees to accept <br /> the solids resulting from the operation of the BHEC zero liquid discharge system at the County <br /> landfill, to the extent allowed by the state and federal agencies, and shall grant Calpine such permits <br /> or authority as necessary. Calpine, at its option and expense, may choose to dispose of the solids at a <br /> location other than the County landfill, however, such decision by Calpine shall not affect the <br /> County' s obligation to accept the solids at the County landfill throughout the Term of the <br /> Agreement. <br /> 7 , Brine Discharge : <br /> a. Calpine and the County acknowledge that the County may, at its <br /> option, choose to pipe discharge water from the County' s South Plant reverse osmosis water <br /> treatment facility ("Brine") to inject into the pipeline from the stormwater park to BHEC for delivery <br /> to BHEC . The County may only inject Brine during periods when BHEC is in operation. The Brine <br /> injection rate, for Brine within the constituency limits shown on Exhibit "D" in the column labeled <br /> "RO Brine Values", shall be limited to eight percent (8 . 0%) of the total flow rate of stormwater <br /> being supplied to BHEC . In the event the Brine exceeds the constituency limits shown on Exhibit <br /> 16 <br /> 8 . 5 .04 Water Agreement <br />