Laserfiche WebLink
"D" in the column labeled "RO Brine Values", Calpine and the County shall, in good faith, negotiate <br /> a reduced Brine injection rate based on maintaining the water supply constituency within the <br /> "Maximum Allowable Limits" as shown on Exhibit "C" . Calpine shall provide and operate a control <br /> system to control the Brine injection rate at the above level unless Calpine provides notification to <br /> the County to reduce the level and provides justification for such reduction in the flow level . The <br /> design of the control scheme will be mutually agreeable to Calpine and the County. Calpine and the <br /> County, based on actual operational data and experience, may agree to inject Brine in quantities <br /> greater than those specified above. <br /> b . When and only when the County is supplying Brine in accordance with <br /> Paragraph 7 . a, the County shall reimburse Calpine for the disposal of solids associated with the Brine <br /> treatment, in an amount to be determined on a monthly basis in accordance with the following : <br /> Amount of Reimbursement = [ADBA/MIR] *[SF *SDC] <br /> ADBA = Average Daily Brine Acceptance (calculated on a monthly basis) <br /> MIR = Maximum Injection Rate: <br /> Phase I MIR = 300, 000 gallons per day <br /> Phase I and II MIR = 600, 000 gallons per day <br /> SF = Solids Factor = Additional solids generated due to acceptance of brine in cooling <br /> water supply to BHEC The Solids Factor will beset at 0. 4 (40%) for the first year <br /> of operation . After the first full year of operation, the Solids Factor will be modified <br /> 17 <br /> 8 . 5 .04 Water Agreement <br />