My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-185
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 11:26:44 AM
Creation date
9/30/2015 7:53:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/10/2004
Control Number
2004-185
Agenda Item Number
12
Entity Name
Blue Heron Energy Center
Subject
Delivery and Use of Stormwater
Area
Blue Heron Energy Center
Archived Roll/Disk#
3223
Supplemental fields
SmeadsoftID
4205
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"D" in the column labeled "RO Brine Values", Calpine and the County shall, in good faith, negotiate <br /> a reduced Brine injection rate based on maintaining the water supply constituency within the <br /> "Maximum Allowable Limits" as shown on Exhibit "C" . Calpine shall provide and operate a control <br /> system to control the Brine injection rate at the above level unless Calpine provides notification to <br /> the County to reduce the level and provides justification for such reduction in the flow level . The <br /> design of the control scheme will be mutually agreeable to Calpine and the County. Calpine and the <br /> County, based on actual operational data and experience, may agree to inject Brine in quantities <br /> greater than those specified above. <br /> b . When and only when the County is supplying Brine in accordance with <br /> Paragraph 7 . a, the County shall reimburse Calpine for the disposal of solids associated with the Brine <br /> treatment, in an amount to be determined on a monthly basis in accordance with the following : <br /> Amount of Reimbursement = [ADBA/MIR] *[SF *SDC] <br /> ADBA = Average Daily Brine Acceptance (calculated on a monthly basis) <br /> MIR = Maximum Injection Rate: <br /> Phase I MIR = 300, 000 gallons per day <br /> Phase I and II MIR = 600, 000 gallons per day <br /> SF = Solids Factor = Additional solids generated due to acceptance of brine in cooling <br /> water supply to BHEC The Solids Factor will beset at 0. 4 (40%) for the first year <br /> of operation . After the first full year of operation, the Solids Factor will be modified <br /> 17 <br /> 8 . 5 .04 Water Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.