Laserfiche WebLink
based on the actual solids generated due to the acceptance of brine in the cooling <br /> water supply to BHEC. <br /> SDC = Solids Disposal Costs for the respective month <br /> c . In the event the injection of Brine into the pipeline from the <br /> storrnwater park to BHEC causes the resulting solids from the BHEC zero liquid discharge system to <br /> be reclassified with a disposal fee differing from that specified in Paragraph 8 . c, then the County <br /> shall be responsible for the cost in excess of the cost calculated using the estimated quantity of solid <br /> waste generated in the BHEC zero liquid discharge system without Brine mJ ection at the disposal fee <br /> specified in Paragraph 8 . c . <br /> d. If the County elects to build a pipeline to supply Brine for inj ection <br /> into the pipeline from the stormwater park to BHEC as described in Paragraph 7 . a, then all costs <br /> associated with the design, permitting and construction of the respective pipeline will be shared at <br /> the ratio of 85 % County and 15 % Calpine, with Calpine ' s 15 % limited to a maximum of $ 200, 000 . <br /> Calpine, at the time of County' s issuance of the building permit for BHEC , shall, at its option, (i) <br /> escrow $200, 000 with the County, or (ii) deliver a Letter of Credit in the amount of $ 200, 000 , <br /> presentable on a Florida bank, to secure this obligation . In the event Calpine ' s 15 % share is less than <br /> $200 , 000, the County shall refund the excess . The County shall be responsible for the operation and <br /> maintenance of such pipeline . <br /> 8 . Fees : <br /> 18 <br /> 8 .5 .04 Water Agreement <br />