My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-106
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2016 10:06:31 AM
Creation date
9/30/2015 7:32:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
05/04/2004
Control Number
2004-106
Agenda Item Number
11.J.1
Entity Name
Brown and Caldwell
Subject
Amendment No.1 to Work Order No.1
Maintenance Site Work Utilities Department Operations Center Complex
Area
41st St. NW and 43rd Ave. NW
Project Number
UCP2229
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3759
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . Stormwater Management Design and Report — Include the 4 .4-acre site in the Operations <br /> Center Complex stormwater management report to include: flood routings, lake sizing, <br /> discharge calculations, and recovery analysis . Prepare plans showing stormwater drainage <br /> control devices, structures and treatment measures on the 4 .4-acre site . <br /> 3 . Site Plan Release — Coordinate permitting needed to release the 4 .4-acre site for stormwater <br /> system approval. <br /> TASK 5 — CONSTRUCTION PLANS AND SPECIFICATIONS <br /> Additional work activities to be completed under Task 5 include the following: <br /> 1 . Earthwork — Include the 4 .4-acre site in the preparation of plans, details and specifications <br /> for site clearing, excavation, fill placement, excess fill placement, and erosion control <br /> measures during construction. Include the 4 .4-acre site in the preparation of the erosion <br /> control plan for Contractor' s NPDES construction stormwater permit application. <br /> 2 . Drainage - Include the 4 .4-acre site in the preparation of plans, details and specifications for <br /> the on-site construction of preliminary site drainage improvements . <br /> 3 . Design Review and Cost Estimates — Include the 4 .4-acre site in this work activity. Conduct <br /> design reviews with Utilities Department staff at approximately the 60, 90 and 100 percent <br /> design completion levels. An Engineer' s Opinion of Probable Cost will be prepared as part <br /> of each design review submittal. <br /> TASK 6 — PERMITTING <br /> Additional work activities to be completed under Task 6 include the following : <br /> 1 . Stormwater/Environmental - Include the 4. 4-acre site when obtaining a St. Johns River <br /> Water Management District E. R.P. permit for "on-site" drainage improvements and wetland <br /> mitigation and in obtaining an IRC Engineering Department Type "A" stormwater permit, <br /> TASK 7 — BIDDING SERVICES <br /> Change Order No . 1 does not require any additional work under Task 7. <br /> TASK 8 — CONSTRUCTION PHASE SERVICES <br /> Change Order No . 1 does not require any additional work under Task 8 . <br /> Change Order No. l AttachmentLdoc <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.