Laserfiche WebLink
evaluation of the anticipated groundwater table, soil characteristics and reuse suitability, and <br /> bearing pressures for building footers. <br /> 3 . Topographic and Tree Survey — Include the 4 .4-acre site in this work activity. Using the <br /> boundary survey provided, survey the south 700 feet of the north 1303 feet of the project <br /> parcel, including the rights-of--way and intersections adjacent to and 300 feet beyond the <br /> project site. Provide a 10040ot grid for site elevations in the undeveloped area along with <br /> any significant breaks in grade or topography between the grids . Provide four (4) typical <br /> cross sections within the grove to establish the ridge and furrow configuration. Locate <br /> existing site improvements and natural features of a dissimilar nature from the surrounding <br /> features. Locate and identify any on-site "protected" trees in the undeveloped area with a <br /> diameter at breast height (dbh) of 4 inches or greater. <br /> 4 . Topographic Survey Drawing — Include the 4 .4-acre site in this work activity. Prepare a <br /> certified survey of the site, meeting Florida Minimum Technical Standards and as required <br /> to meet Chapter 914 of the Indian River County Land Development Code . <br /> TASK 3 — PRELIMINARY DESIGN PHASE <br /> Additional work activities to be completed under Task 3 include the following : <br /> 1 . Preliminary Meetings — include the 4 .4-acre site in this work activity. Prepare for and attend <br /> up to four meetings with Utilities Department staff to identify site requirements. <br /> 2 . Conceptual Site Plan and Calculations — Develop conceptual site plan for the 4. 4-acre site to <br /> determine appropriate area of impervious area to include with preliminary site plan <br /> submittal of Operations Center Complex. <br /> 3 . Preliminary Stormwater Management Plan - Develop a master stormwater plan for the 4 . 4- <br /> acre site showing preliminary location of conveyance system, stormwater treatment and <br /> outfall structures . <br /> 4 . Technical Review Committee Meeting — Include the 4.4-acre site in this work activity. <br /> Attend Technical Review Committee (TRC) meeting of the preliminary site plan. Meet with <br /> Utilities Department staff to review, discuss and determine appropriate response to TRC <br /> comments . <br /> TASK 4 — SITE PLAN APPROVAL <br /> Additional work activities to be completed under Task 4 include the following: <br /> 1 . Site Plan Application and Submittals - Revise conceptual site plan per comments of <br /> preliminary TRC review. Revise 4 .4-acre site concept as needed and include in submittal <br /> applications for site plan approval . <br /> Change Order No. 1 Attachment 1 . doc <br /> Page 2 of 3 <br />