My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-247
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-247
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2016 2:43:43 PM
Creation date
9/30/2015 9:52:03 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
07/11/2006
Control Number
2006-247
Agenda Item Number
11.C.2
Entity Name
Peter R. Brown Construction, Inc.
Subject
Indian River County Jail medical/infirmary addition and renovation
Area
41st Avenue
Project Number
04083
Supplemental fields
SmeadsoftID
5722
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peter <br /> • tOOC. M <br /> PEIEPR BIIOWNCDXSTPYRWN. L. <br /> Indian River County Jail Expansion <br /> Medical/Infirmary Addition & Renovation <br /> June 28 , 2006 <br /> 07A-2 . Cant strips , aluminum coping , aluminum scuppers, aluminum collectors , <br /> aluminum downspouts , aluminum drip edge and flashing are included for the <br /> above roof system . <br /> 07B Detention Caulking, Building Insulation, Waterproofing and Dampproofing <br /> 0713- 1 . Detention caulking is included as follows : <br /> a . Perimeter of wall/floor intersection <br /> b. Vertical calking at the inside wall intersection and CMU control joints <br /> c. Perimeter of plaster ceiling intersections with CMU walls <br /> d . (70) Lights <br /> e. ( 15) Switches <br /> f. ( 120) Wall Plates <br /> g . ( 16) Plumbing Fixtures <br /> 0713-2. The cost for moisture proof membrane and 1 -1 /2" rigid insulation is included at <br /> walls indicated to receive the 4"CMU veneer. <br /> 0713-3. Non detention caulking will be installed at exterior masonry control joints. <br /> 09A Security Plaster <br /> 09A- 1 . Security gypsum ceilings are included in areas indicated as hollow core on sheet <br /> A8 . 5 . <br /> 09A-2 . Security gypsum ceiling system is included as 1 - 1 /2" channel iron suspended <br /> with #8 hangar wire spaced 36" OC with 20-gauge hat channel cross furring , <br /> security lath and 3/4" Portland cement over lath . <br /> 09B Drywall <br /> 096- 1 . The cost for a 2'-0" high and 2'-0" deep gypsum bulkhead is included for all the <br /> wall cabinets . Security plaster.for the gypsum bulkhead is not included . <br /> 09E Flooring <br /> 09E- 1 . VCT Flooring and base is included in the following areas: <br /> a . 200 Waiting j . 210 Exam <br /> b . 201 Nurse k . 212 Exam <br /> c. 202 Medical Records I . 213 Exam <br /> d . 203 Exam m . 214 Corridor <br /> e. 204 Pharmacy n . 215 Staff Toilet <br /> f. 205 Meds o . 216 Inmate Toilet <br /> g . 206 Office p . 217 Corridor <br /> h . 207 Office q . 218 Soil <br /> i . 209 Dental r. 219 Clean <br /> Page 4 of 7 <br /> M92006 Projects\IRC Jail\Infirnary\ESTIMATE SUBMITTAL DOCUMENTS\IRCJ Infirmary Clarifications r2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.