Laserfiche WebLink
Peter <br /> �OO W <br /> PCIEMR BnONM NM51P11LT1O.Y. lYC. <br /> Indian River County Jail Expansion <br /> Medical/Infirmary Addition & Renovation <br /> June 28, 2006 <br /> 09F Painting <br /> 09F- 1 . Sealed concrete floor finish is included in the fallowing areas: <br /> a . 211 Mechanical j . 229 Medical Isolation <br /> b . 220 Medical Isolation k. 230 Medical Isolation <br /> c. 221 Medical Isolation I . 231 Medical Isolation <br /> d . 222 Medical Isolation m . 232 Janitor <br /> e. 223 Medical Isolation n . 233 Corridor <br /> f. 224 Medical Isolation o. 234 Handicap Medical <br /> g . 225 Medical Isolation Isolation <br /> h . 226 Medical Isolation p. 235 Handicap Medical <br /> i . 228 Vestibule Isolation <br /> 09F-2 . The cost to paint drywall , security plaster and exposed ceiling is included . <br /> 09F-3 . The cost for applying a clear sealer to the exterior masonry walls is included . <br /> Exterior painting/sealing is limited to the new walls and walls disturbed by the <br /> construction of the Infirmary Addition . <br /> 09G Epoxy Finishes <br /> 09G- 1 . Epoxy flooring finish is included in the following areas : <br /> a . 227 Shower <br /> b . 234 Handicap Medical Isolation (Shower area only) <br /> c. 235 Handicap Medical Isolation (Shower area only) <br /> 09G-2 . Epoxy wall paint is included in the following rooms : <br /> a . 209 Dental n . 226 Medical Isolation <br /> b . 210 Exam o . 227 Shower <br /> c. 212 Exam p . 228 Vestibule <br /> d . 213 Exam q . 229 ,Medical Isolation <br /> e . 203 Exam r. 230 Medical Isolation <br /> f. 216 Inmate Toilet s. 231 Medical Isolation <br /> g . 218 Soil t . 232 Janitor <br /> h . 220 Medical Isolation u . 233 Corridor <br /> i. 221 Medical Isolation v. 234 Handicap Medical <br /> j . 222 Medical Isolation Isolation <br /> k. 223 Medical Isolation w. 235 Handicap Medical <br /> I . 234 Medical Isolation Isolation <br /> m . 225 Medical Isolation <br /> 10A Toilet, Bath and Miscellaneous Accessories <br /> 10A- 1 . No clarifications at this time. <br /> Page 5 of 7 <br /> M:\2006 Projects\IRC Jail\infirmary\ESTIMATE SUBMITTAL DOCUMENTS\IRCJ Infirmary Clarifications r2.doc <br />