My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-029
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2016 1:49:41 PM
Creation date
9/30/2015 11:56:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
01/22/2008
Control Number
2008-029
Agenda Item Number
11.J.2
Entity Name
Camp Dresser & McKee
Subject
Relocate Biosolids Dewatering Facility
Amendment No. 2 to Work Order No.3
Area
County Landfill Site
Supplemental fields
SmeadsoftID
6850
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br /> CDM will provide additional engineering services related to design and permitting required to <br /> relocate the BDF from its current location to the selected new location within the landfill. <br /> The following described engineering services are scope items required to relocate the proposed <br /> facilities. These services are addressed in the preliminary and final design and permitting <br /> services covered under this amendment: <br /> Task 1.0 Preliminary Design <br /> This task provides for the preparation of a Preliminary Design Report including performing <br /> topographic survey and geotechnical services, establishing of necessary design criteria, <br /> identifying specific permitting requirements, and preparation of a preliminary design level <br /> opinion of probable cost. Relocation of the BDF within the landfill will require site investigation <br /> of the new location, including surveying and subsurface investigation. CDM will subcontract <br /> with a surveying firm to provide a specific purpose survey of the new location and with a <br /> geotechnical engineering firm to conduct subsurface investigation of the new location and <br /> provide a subsurface investigation report. The results of the survey and subsurface <br /> investigation will be reviewed by CDM and incorporated as required into the design of the <br /> relocated facility. The requested budget amendment for Task 1 .0 is presented in Table 1. The <br /> projected project labor disaggregation is presented in Table 2. <br /> Task 2. 0 Permitting Services <br /> This task provides for the preparation of necessary permit applications, meetings, and <br /> negotiation with regulatory agencies and preparation of responses to Requests for Additional <br /> Information (RAI) by IRC Planning and Zoning. The additional permitting services related to <br /> the relocation of the BDF will be provided: <br /> ■ Modification and resubmittal of Notice of Intent to Use General Permit for Construction <br /> of Wastewater Collection/Transmission system, <br /> ■ Modification and resubmittal of Notice of Intent to Use General Permit for Construction <br /> of Water Main Extension, and <br /> ■ Modification and submittal of Wastewater Permit for Domestic Wastewater Facilities <br /> ■ Modification and submittal of the C&D debris Solids Waste Permit <br /> ■ Revision and submittal of IRC Site Plan Permit Application <br /> ■ Modification and submittal of FDEP Environmental Resource Permit <br /> ■ Preparation and submittal of Indian River Farms Water Control District Permit for <br /> relocation of stormwater outfall. <br /> FDEP regulations do not allow the Notice of Intent to Use General Permit for construction of <br /> the wastewater collection/ transmission system and water main extension to be modified. <br /> These two applications will need to be repackaged and submitted as new to FDEP for <br /> 2 b1467 dw <br />
The URL can be used to link to this page
Your browser does not support the video tag.