SCOPE OF SERVICES <br />CDM will provide additional engineering services related to design and permitting required to <br />relocate the BDF from its current location to the selected new location within the landfill. <br />The following described engineering services are scope items required to relocate the proposed <br />facilities. These services are addressed in the preliminary and final design and permitting <br />services covered under this amendment: <br />Task 1.0 Preliminary Design <br />This task provides for the preparation of a Preliminary Design Report including performing <br />topographic survey and geotechnical services, establishing of necessary design criteria, <br />identifying specific permitting requirements, and preparation of a preliminary design level <br />opinion of probable cost. Relocation of the BDF within the landfill will require site investigation <br />of the new location, including surveying and subsurface investigation. CDM will subcontract <br />with a surveying firm to provide a specific purpose survey of the new location and with a <br />geotechnical engineering firm to conduct subsurface investigation of the new location and <br />provide a subsurface investigation report. The results of the survey and subsurface <br />investigation will be reviewed by CDM and incorporated as required into the design of the <br />relocated facility. The requested budget amendment for Task 1.0 is presented in Table 1. The <br />projected project labor disaggregation is presented in Table 2. <br />Task 2.0 Permitting Services <br />This task provides for the preparation of necessary permit applications, meetings, and <br />negotiation with regulatory agencies and preparation of responses to Requests for Additional <br />Information (RAI) by IRC Planning and Zoning. The additional permitting services related to <br />the relocation of the BDF will be provided: <br />■ Modification and resubmittal of Notice of Intent to Use General Permit for Construction <br />of Wastewater Collection/Transmission system, <br />■ Modification and resubmittal of Notice of Intent to Use General Permit for Construction <br />of Water Main Extension, and <br />■ Modification and submittal of Wastewater Permit for Domestic Wastewater Facilities <br />■ Modification and submittal of the C&D debris Solids Waste Permit <br />■ Revision and submittal of IRC Site Plan Permit Application <br />■ Modification and submittal of FDEP Environmental Resource Permit <br />■ Preparation and submittal of Indian River Farms Water Control District Permit for <br />relocation of stormwater outfall. <br />FDEP regulations do not allow the Notice of Intent to Use General Permit for construction of <br />the wastewater collection/ transmission system and water main extension to be modified. <br />These two applications will need to be repackaged and submitted as new to FDEP for <br />b1467 dw <br />