My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-029
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2016 1:49:41 PM
Creation date
9/30/2015 11:56:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
01/22/2008
Control Number
2008-029
Agenda Item Number
11.J.2
Entity Name
Camp Dresser & McKee
Subject
Relocate Biosolids Dewatering Facility
Amendment No. 2 to Work Order No.3
Area
County Landfill Site
Supplemental fields
SmeadsoftID
6850
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approval. IRC will be responsible for paying all applicable fees required for filing of all the <br /> permit applications included under this task. The requested budget amendment for Task 2.0 <br /> is presented in Table 1 . The projected project labor disaggregation is presented in Table 2. <br /> Task 3. 0 Final Design <br /> This task provides for the preparation of final design and bid ready documents for the BDF. The <br /> additional final design services related to the relocation of the BDF will be provided: <br /> ■ Redesign of site grading and drainage for the BDF including redesign of swale system to <br /> receive and convey storm water from the BDF to the landfill storm water collection <br /> system. <br /> ■ Modification of structural foundations and equipment pads based on subsurface <br /> investigation results. Should subsurface investigation reveal unsuitable materials or soil <br /> conditions sufficiently different from conditions at original BDF location to require <br /> substantial redesign of structural foundations, additional services beyond this <br /> amendment may be required. <br /> ■ Redesign of centrate pumping station including related mechanical, electrical and <br /> instrumentation components to accommodate new BDF location and constraints. <br /> ■ Redesign of wastewater force main for centrate discharge to accommodate new BDF <br /> location and constraints. <br /> ■ Redesign of water main extension to accommodate new BDF location and constraints. <br /> ■ Revised opinion of probable cost. <br /> The requested budget amendment for Task 3.0 is presented in Table 1 . The projected project <br /> labor disaggregation is presented in Table 2. <br /> OTHER SERVICES NOT INCLUDED IN THIS SCOPE OF SERVICES <br /> The following list of items is not included in this Scope of Services but will be addressed in <br /> separate proposals or will be negotiated separately with IRC, if required: <br /> A. Excavation for field verification of the actual locations of existing underground utilities <br /> and structures. If field verification is necessary, excavation shall be provided by IRC as <br /> directed by CDM. <br /> B. Services associated with assisting IRC in the review and evaluation of patent-related <br /> disputes, issues, or claims including preparing to serve or serving as a consultant or <br /> witness for IRC in litigation, arbitration, public or private hearings, or other legal or <br /> administrative proceedings involving patent-related disputes, issues, or claims. <br /> C. Additional services in connection with the project not otherwise provided for in this <br /> Scope of Services. <br /> 3 inl467 dao <br />
The URL can be used to link to this page
Your browser does not support the video tag.