My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-029
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:47:30 AM
Creation date
9/30/2015 11:56:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
01/22/2008
Control Number
2008-029
Agenda Item Number
11.J.2
Entity Name
Camp Dresser & McKee
Subject
Relocate Biosolids Dewatering Facility
Amendment No. 2 to Work Order No.3
Area
County Landfill Site
Supplemental fields
SmeadsoftID
6850
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approval. IRC will be responsible for paying all applicable fees required for filing of all the <br />permit applications included under this task. The requested budget amendment for Task 2.0 <br />is presented in Table 1. The projected project labor disaggregation is presented in Table 2. <br />Task 3.0 Final Design <br />This task provides for the preparation of final design and bid ready documents for the BDF. The <br />additional final design services related to the relocation of the BDF will be provided: <br />■ Redesign of site grading and drainage for the BDF including redesign of swale system to <br />receive and convey storm water from the BDF to the landfill storm water collection <br />system. <br />■ Modification of structural foundations and equipment pads based on subsurface <br />investigation results. Should subsurface investigation reveal unsuitable materials or soil <br />conditions sufficiently different from conditions at original BDF location to require <br />substantial redesign of structural foundations, additional services beyond this <br />amendment may be required. <br />■ Redesign of centrate pumping station including related mechanical, electrical and <br />instrumentation components to accommodate new BDF location and constraints. <br />■ Redesign of wastewater force main for centrate discharge to accommodate new BDF <br />location and constraints. <br />■ Redesign of water main extension to accommodate new BDF location and constraints. <br />■ Revised opinion of probable cost. <br />The requested budget amendment for Task 3.0 is presented in Table 1. The projected project <br />labor disaggregation is presented in Table 2. <br />OTHER SERVICES NOT INCLUDED IN THIS SCOPE OF SERVICES <br />The following list of items is not included in this Scope of Services but will be addressed in <br />separate proposals or will be negotiated separately with IRC, if required: <br />A. Excavation for field verification of the actual locations of existing underground utilities <br />and structures. If field verification is necessary, excavation shall be provided by IRC as <br />directed by CDM. <br />B. Services associated with assisting IRC in the review and evaluation of patent -related <br />disputes, issues, or claims including preparing to serve or serving as a consultant or <br />witness for IRC in litigation, arbitration, public or private hearings, or other legal or <br />administrative proceedings involving patent -related disputes, issues, or claims. <br />C. Additional services in connection with the project not otherwise provided for in this <br />Scope of Services. <br />jb1467. Ccc <br />
The URL can be used to link to this page
Your browser does not support the video tag.