approval. IRC will be responsible for paying all applicable fees required for filing of all the <br /> permit applications included under this task. The requested budget amendment for Task 2.0 <br /> is presented in Table 1 . The projected project labor disaggregation is presented in Table 2. <br /> Task 3. 0 Final Design <br /> This task provides for the preparation of final design and bid ready documents for the BDF. The <br /> additional final design services related to the relocation of the BDF will be provided: <br /> ■ Redesign of site grading and drainage for the BDF including redesign of swale system to <br /> receive and convey storm water from the BDF to the landfill storm water collection <br /> system. <br /> ■ Modification of structural foundations and equipment pads based on subsurface <br /> investigation results. Should subsurface investigation reveal unsuitable materials or soil <br /> conditions sufficiently different from conditions at original BDF location to require <br /> substantial redesign of structural foundations, additional services beyond this <br /> amendment may be required. <br /> ■ Redesign of centrate pumping station including related mechanical, electrical and <br /> instrumentation components to accommodate new BDF location and constraints. <br /> ■ Redesign of wastewater force main for centrate discharge to accommodate new BDF <br /> location and constraints. <br /> ■ Redesign of water main extension to accommodate new BDF location and constraints. <br /> ■ Revised opinion of probable cost. <br /> The requested budget amendment for Task 3.0 is presented in Table 1 . The projected project <br /> labor disaggregation is presented in Table 2. <br /> OTHER SERVICES NOT INCLUDED IN THIS SCOPE OF SERVICES <br /> The following list of items is not included in this Scope of Services but will be addressed in <br /> separate proposals or will be negotiated separately with IRC, if required: <br /> A. Excavation for field verification of the actual locations of existing underground utilities <br /> and structures. If field verification is necessary, excavation shall be provided by IRC as <br /> directed by CDM. <br /> B. Services associated with assisting IRC in the review and evaluation of patent-related <br /> disputes, issues, or claims including preparing to serve or serving as a consultant or <br /> witness for IRC in litigation, arbitration, public or private hearings, or other legal or <br /> administrative proceedings involving patent-related disputes, issues, or claims. <br /> C. Additional services in connection with the project not otherwise provided for in this <br /> Scope of Services. <br /> 3 inl467 dao <br />