Laserfiche WebLink
Start Up Services and O &M Manuals <br /> The original contract specifically excluded start up services and Operation and Maintenance <br /> (O&M) Manuals . CDM provided limited start up services to review operating equipment and <br /> also reviewed O&M Manuals submitted by Contractor. <br /> Additional Record Drawing Production <br /> The original scope of work for the design of the plant expansion identified 139 drawings for the <br /> design of the plant. The actual number of sheets for the plant design was 169 sheets . This task is <br /> for the effort to conform the project record drawings beyond the original scope of the project. <br /> This task does not seek to recover the additional design costs for these sheets . <br /> SCHEDULE <br /> The project is expected to be complete within the next 30 days . <br /> A- 5 j12142. doc <br />