Laserfiche WebLink
■ Prepare a letter report presenting the results of our analyses for inclusion in the permit <br /> renewal <br /> TASK 3 . 2 - LANDFILL OPERATIONS PERMIT RENEWAL <br /> CDM will prepare a renewal application for the IRC SWDD Landfill Class I Operations permit. <br /> The majority of the work for the permit renewal is performed under a previous SWDD <br /> authorization for the permit modification for Segment II . The permit it is more cost effective to <br /> renew than modify since it is nearing the expiration date and the scope has expanded to include <br /> placement of C&D waste on Segment I . The tasks presented here are in addition to the results <br /> of the landfill geotechnical evaluation approved by SWDD for Segment II . CDM expects to <br /> complete the following portions of the FDEP Solid Waste Application form to modify the <br /> permit: <br /> ■ Complete Part A General Information (In Previous Authorization) <br /> ■ Complete Part B Disposal Facility General Information (In Previous Authorization) <br /> ■ Complete Part E Solid Waste Management Facility Permit Requirements, General (In <br /> Previous Authorization) <br /> ■ Complete Part F Landfill Permit Requirements — prepare Plot Plan and revised <br /> Topographic Plan for the Class I Landfill with the C&D horizontal <br /> expansion. Also included is updated Class I facility life information, <br /> perform C&D cell life calculations . <br /> ■ Complete Part H Landfill Construction Requirements for the C& D horizontal expansion <br /> ■ Complete Part J Geotechnical Investigation Requirements — this will be the letter report <br /> developed for the Geotechnical analysis . <br /> ■ Modify Part L Landfill Operation Requirements portions of which will be requested of <br /> Waste Management Inc . , the current operators of the Class I operation the <br /> C&D placement sequence will developed by CDM . <br /> ■ Modify Part P Landfill Closure Requirements — existing cross sections will be modified <br /> to show the changes to the Class I Landfill . Also changes to the <br /> stormwater letdowns will be shown. CDM will address stormwater <br /> drainage issues on the South side of Segment I . <br /> ■ Complete Part T Certification by Applicant and Engineer now covering the permit renewal <br /> and C& D cell . <br /> A contingency has also been added to allow for CDM to address any issues raised by FDEP <br /> during the Pre-Application meeting . This will cover additional figures, tables, or language <br /> needing to be written to address any concerns for the initial submittal to FDEP. <br /> B-4 rb4520 .doc <br />