Laserfiche WebLink
resampling is the result from errors made by the sampling staff, IRC will not be invoiced . <br /> CDM/ ITS will deliver the samples to the ECL Orlando office for analysis . <br /> ECL will perform the laboratory analysis under IRC SWDD' s contract. CDM will assist IRC <br /> SWDD in coordinating the analytical testing activities with ECL, notify FDEP prior to sampling <br /> as required by the MPIS, review and evaluate the analytical test results, and prepare the semi- <br /> annual reports . <br /> CDM will prepare two semi-annual reports that will be submitted to FDEP within 60 days of <br /> receipt of valid laboratory results from the laboratory that is contracted by IRC SWDD to <br /> analyze samples . Services included in preparing the semi-annual reports include : <br /> ■ Review of laboratory result with respect to FDEP groundwater quality criteria and historical <br /> laboratory results . If review of the data indicates potential errors in the results or <br /> concentrations of analyses that could potentially result in enforcement action, CDM will <br /> notify IRC SWDD prior to preparing the report and request confirmatory samples, if needed . <br /> ■ Preparation of semi-annual monitoring reports for the January and July monitoring events . <br /> The reports will include brief discussions of the results, water level contour maps, and copies <br /> of the analytical reports a draft report will be submitted for review, if requested . <br /> ■ CDM will prepare three copies of the final report for submittal to FDEP and will provide one <br /> file copy to IRC SWDD <br /> IRC SWDD will provide copies of analytical reports in electronic format (Validator, AdApt, or <br /> other electronic format accepted by FDEP) . <br /> TASK 3 . 0 - TITLE V PERMIT COMPLIANCE AND REPORTING <br /> Title V Permit No . 0610015-003-AV contains monitoring and reporting requirements related to <br /> the landfill gas collection and control system. CDM will assist IRC SWDD, as described below, <br /> in fulfilling all air permit requirements and conditions within the required regulatory <br /> timeframes . <br /> Statement of Compliance <br /> CDM will prepare and submit the annual Statement of Compliance for the IRC Landfill. This <br /> document must be submitted to FDEP within 60 days after the end of the calendar year, as <br /> required by Rule 62-213 .440 (3) ( a) (2) , F . A . C . <br /> Annual Operating Report <br /> CDM will prepare and submit the Annual Operating Report for the IRC Landfill . This report <br /> must be submitted to FDEP or before March 1 of each calendar year using the annual operating <br /> report form for an air pollutant emitting facility, as required by Rule 62-210 . 370 (3) , F . A . C . <br /> CDM will estimate the annual emission rates of non-methane organic compounds and volatile <br /> organic compounds from the landfill gas to determine the IRC Landfill' s status with regard to <br /> A-3 jb2026 . doc <br />