Laserfiche WebLink
■ Project Quality Management <br /> ■ Annual and semi-annual water quality reporting, <br /> ■ Title V reporting, <br /> ■ General Technical and miscellaneous permit compliance monitoring and reporting <br /> SCOPE OF SERVICES <br /> CDM will undertake the annual permit compliance monitoring and reporting, which will <br /> include the following tasks : <br /> Task 1 : Project Quality Management <br /> Task 2 : Annual and Semi-Annual Sampling and Reporting <br /> Task 3 : Title V Permit Compliance and Reporting; and <br /> Task 4 : General Technical and Miscellaneous Permit Compliance Reporting <br /> TASK 1 . 0 - PROJECT QUALITY MANAGEMENT <br /> Activities performed under this task consist of those generally administrative functions <br /> required to assure that the project remains on schedule, within budget, and that the quality of <br /> the work products defined within this scope is consistent with CDM' s standards and IRC <br /> SWDD' s expectations . <br /> CDM will meet with IRC SWDD staff monthly for project planning and coordination . CDM' s <br /> project manager will prepare and submit monthly status reports and attend status reporting <br /> meetings throughout the life of the project. It is estimated that meetings will be held on the <br /> average of once a month . Preparation of invoices and project administration will also be <br /> performed under this task . <br /> TASK 2 . 0 - ANNUAL AND SEMI-ANNUAL SAMPLING AND REPORTING <br /> CDM will assist IRC SWDD with all sampling preparation activities, including scheduling, <br /> staffing, subcontracting, and field equipment preparation. CDM will perform the field testing, <br /> sample collection, and water-level measurements . CDM will contract with Ideal Tech Service <br /> Inc . ( ITS) to perform the groundwater, surface water, and leachate sampling. CDM/ ITS will <br /> perform the semi-annual (January and July) sampling of the 27 (currently installed) Class I <br /> landfill groundwater monitor wells and 6 (currently installed) construction and demolition <br /> (C&D) debris landfill groundwater monitor wells (33 total wells) for the list of Semi-Annual <br /> Ground Water Parameters on Attachment D and Attachment E of the MPIS, respectively . <br /> CDM / ITS will collect water level data for the groundwater monitor wells and staff gauge prior <br /> to the sampling event. CDM / ITS will also perform semi-annual (January and July) sampling of <br /> the two surface water sites for analysis of the list of Semi-Annual Surface Water Parameters <br /> presented as Attachment G of the MPIS and annual leachate sampling from the leachate <br /> monitoring sites for analysis of the list of Annual Leachate Parameters presented as Attachment <br /> H of the MPIS . It is estimated that data collection and sampling will take four days to complete <br /> per sampling event. In the event that FDEP requires resampling of groundwater monitoring <br /> wells, the labor and materials will be invoiced under Task 4 of this Scope of Services . If the <br /> A-2 jbzozs doc <br />