Laserfiche WebLink
The duties and responsibilities and the limitations of the authority of the PR are as described <br />below: <br />LIMITATIONS OF AUTHORITY <br />Project Representative shall have limitations as follows: <br />a. Shall not authorize any deviation from the Design Documents or substitution of materials or <br />equipment, unless authorized by CDM and IRC SWDD <br />b. Shall not exceed limitations of CDM's authority as set forth in the Agreement of the Design <br />Documents <br />c. Shall not undertake any of the responsibilities of IRC SWDD, subcontractors or IRC SWDD's <br />superintendent <br />d. Shall not advise on, issue directions relative to, or assume control over any aspect of the <br />means, methods, techniques, sequences, or procedures of construction unless such advice or <br />directions are specifically required by the design drawings and permit documents <br />e. Shall not advise on, issue directions regarding, or assume control over, safety precautions <br />and programs in connection with the work <br />f. Shall not accept shop drawing or sample submittals from any one other than IRC SWDD <br />g. Shall not participate in specialized field or laboratory tests or inspections conducted by <br />others except as specifically authorized by CDM <br />TASK 6.0 - SPECIAL ENGINEERING SERVICES DURING CONSTRUCTION <br />Activities performed under these tasks consist of supplementary and special engineering <br />services required during the construction and implementation of the project. ). Smith <br />Engineering Consultants, Inc. and John H. Dean Architect & Associates will assist CDM with <br />general engineering services related to the electrical and architectural/structural work, <br />respectively. <br />Subtask 6.1 Record Drawings <br />CDM will coordinate the receipt and review of the Contractor's information showing those <br />changes made during the construction process. Coordinate the receipt and review of the <br />Contractor's certified survey of the Work. Participate in a final project closeout meeting with <br />IRC SWDD and Contractor. Prepare for IRC SWDD a set of reproducible record drawings and <br />two blueline prints showing those significant changes made during the construction process <br />based on information furnished to CDM by the Contractor. <br />Subtask 6.2 Change Order Preparation <br />Provide services in connection with preparing change orders to reflect changes to the <br />construction project. <br />Subtask 6.3 Certification of Completion <br />Provide services in connection with preparing final certifications of completion of construction. <br />A-10 jb15W aoo <br />