My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-094
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2016 9:34:46 AM
Creation date
10/1/2015 12:02:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/18/2008
Control Number
2008-094
Agenda Item Number
14.B.3
Entity Name
Camp Dresser & McKee
Subject
Oslo Customer Convenience Center Work Order No.9
Area
Oslo Custormer Convience Center
Supplemental fields
SmeadsoftID
6941
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The duties and responsibilities and the limitations of the authority of the PR are as described <br /> below: <br /> LIMITATIONS OF AUTHORITY <br /> Project Representative shall have limitations as follows: <br /> a. Shall not authorize any deviation from the Design Documents or substitution of materials or <br /> equipment, unless authorized by CDM and IRC SWDD <br /> b. Shall not exceed limitations of CDM's authority as set forth in the Agreement of the Design <br /> Documents <br /> c. Shall not undertake any of the responsibilities of IRC SWDD, subcontractors or IRC SWDD's <br /> superintendent <br /> d. Shall not advise on, issue directions relative to, or assume control over any aspect of the <br /> means, methods, techniques, sequences, or procedures of construction unless such advice or <br /> directions are specifically required by the design drawings and permit documents <br /> e. Shall not advise on, issue directions regarding, or assume control over, safety precautions <br /> and programs in connection with the work <br /> f. Shall not accept shop drawing or sample submittals from any one other than IRC SWDD <br /> g. Shall not participate in specialized field or laboratory tests or inspections conducted by <br /> others except as specifically authorized by CDM <br /> TASK 6.0 - SPECIAL ENGINEERING SERVICES DURING CONSTRUCTION <br /> Activities performed under these tasks consist of supplementary and special engineering <br /> services required during the construction and implementation of the project. ) . Smith <br /> Engineering Consultants, Inc. and John H. Dean Architect & Associates will assist CDM with <br /> general engineering services related to the electrical and architectural/ structural work, <br /> respectively. <br /> Subtask 6.1 Record Drawings <br /> CDM will coordinate the receipt and review of the Contractor' s information showing those <br /> changes made during the construction process. Coordinate the receipt and review of the <br /> Contractor's certified survey of the Work. Participate in a final project closeout meeting with <br /> IRC SWDD and Contractor. Prepare for IRC SWDD a set of reproducible record drawings and <br /> two blueline prints showing those significant changes made during the construction process <br /> based on information furnished to CDM by the Contractor . <br /> Subtask 6.2 Change Order Preparation <br /> Provide services in connection with preparing change orders to reflect changes to the <br /> construction project. <br /> Subtask 6.3 Certification of Completion <br /> Provide services in connection with preparing final certifications of completion of construction. <br /> A-10 jb15W aoo <br />
The URL can be used to link to this page
Your browser does not support the video tag.