My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-094
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2016 9:34:46 AM
Creation date
10/1/2015 12:02:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/18/2008
Control Number
2008-094
Agenda Item Number
14.B.3
Entity Name
Camp Dresser & McKee
Subject
Oslo Customer Convenience Center Work Order No.9
Area
Oslo Custormer Convience Center
Supplemental fields
SmeadsoftID
6941
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subtask 1.4 - Site Investigation <br /> Subtask 1.4.1 Subsurface Investigation <br /> Using the preliminary site plan, CDM will perform a subsurface investigation to explore the <br /> subsurface soil conditions and to evaluate the limits of waste within the proposed facility <br /> location. It is anticipated that soil borings, test pits, and/ or piezocones (or a combination of <br /> these) will be required to explore the limits of waste and for the foundation design and site <br /> preparation of the new convenience center. An allowance for soil borings, test pits, and/ or <br /> piezocones is provided in this Scope of Services. IRC SWDD will be responsible for excavating <br /> the test pits, disposing of the waste, and backfilling the pit with clean soil to full depth. <br /> This geotechnical exploration does not include environment/ chemical sampling or testing of <br /> the materials or groundwater encountered within the site. <br /> CDM will prepare a geotechnical report summarizing the results of the subsurface investigation <br /> program, including existing geotechnical investigations. This summary will include results of <br /> the boring and test logs and results of laboratory classification testing of selected samples. <br /> Recommendations for foundation design and site preparation will be included in the report. <br /> Any solid waste or undesirable materials discovered within the vicinity of the facility's <br /> foundation will need to be excavated and replaced with structural fill by the Contractor during <br /> construction of the facility. <br /> Subtask 1.4.2 Solid Waste Assessment <br /> Under this subtask, CDM will perform an assessment of the existing solid waste (depth of <br /> waste, type of waste, need for LFG control, etc.) in the proposed location, surface sweeps for <br /> landfill gas, will also be provided. <br /> This Scope of Work does not include a traffic study or relocation of the existing access road. It is <br /> assumed that the existing road will be used to access the new facility. <br /> Subtask 1.5 - Preparation of Design Drawings <br /> CDM will prepare permitting/ construction drawings of the proposed improvements which <br /> shall show the location, size, and spatial relationships between existing and proposed <br /> structures, equipment, and other improvements. CDM will subcontract the architectural, <br /> structural, HVAC/ Plumbing and landscape/ irrigation design services to John H. Dean <br /> Architect & Associates and the electrical design services to Smith Engineering Consultants, Inc. <br /> All civil and geotechnical engineering design will be performed by CDM. The level of detail and <br /> information to be shown on the drawings shall be in conformance with generally accepted <br /> standards of the engineering and construction industry. Drawings shall be prepared using <br /> AutoCAD 2005 . It is anticipated that the Drawing set will include the following engineering <br /> disciplines: <br /> ■ General (CDM) <br /> ■ Civil (CDM) <br /> ■ Structural (John H. Dean Architect & Associates) <br /> ■ Architectural (John H. Dean Architect & Associates) <br /> ■ HVAC/ Plumbing (John H. Dean Architect & Associates) <br /> A-3 ibi 566 aoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.