Laserfiche WebLink
Subtask 1.4 - Site Investigation <br /> Subtask 1.4.1 Subsurface Investigation <br /> Using the preliminary site plan, CDM will perform a subsurface investigation to explore the <br /> subsurface soil conditions and to evaluate the limits of waste within the proposed facility <br /> location. It is anticipated that soil borings, test pits, and/ or piezocones (or a combination of <br /> these) will be required to explore the limits of waste and for the foundation design and site <br /> preparation of the new convenience center. An allowance for soil borings, test pits, and/ or <br /> piezocones is provided in this Scope of Services. IRC SWDD will be responsible for excavating <br /> the test pits, disposing of the waste, and backfilling the pit with clean soil to full depth. <br /> This geotechnical exploration does not include environment/ chemical sampling or testing of <br /> the materials or groundwater encountered within the site. <br /> CDM will prepare a geotechnical report summarizing the results of the subsurface investigation <br /> program, including existing geotechnical investigations. This summary will include results of <br /> the boring and test logs and results of laboratory classification testing of selected samples. <br /> Recommendations for foundation design and site preparation will be included in the report. <br /> Any solid waste or undesirable materials discovered within the vicinity of the facility's <br /> foundation will need to be excavated and replaced with structural fill by the Contractor during <br /> construction of the facility. <br /> Subtask 1.4.2 Solid Waste Assessment <br /> Under this subtask, CDM will perform an assessment of the existing solid waste (depth of <br /> waste, type of waste, need for LFG control, etc.) in the proposed location, surface sweeps for <br /> landfill gas, will also be provided. <br /> This Scope of Work does not include a traffic study or relocation of the existing access road. It is <br /> assumed that the existing road will be used to access the new facility. <br /> Subtask 1.5 - Preparation of Design Drawings <br /> CDM will prepare permitting/ construction drawings of the proposed improvements which <br /> shall show the location, size, and spatial relationships between existing and proposed <br /> structures, equipment, and other improvements. CDM will subcontract the architectural, <br /> structural, HVAC/ Plumbing and landscape/ irrigation design services to John H. Dean <br /> Architect & Associates and the electrical design services to Smith Engineering Consultants, Inc. <br /> All civil and geotechnical engineering design will be performed by CDM. The level of detail and <br /> information to be shown on the drawings shall be in conformance with generally accepted <br /> standards of the engineering and construction industry. Drawings shall be prepared using <br /> AutoCAD 2005 . It is anticipated that the Drawing set will include the following engineering <br /> disciplines: <br /> ■ General (CDM) <br /> ■ Civil (CDM) <br /> ■ Structural (John H. Dean Architect & Associates) <br /> ■ Architectural (John H. Dean Architect & Associates) <br /> ■ HVAC/ Plumbing (John H. Dean Architect & Associates) <br /> A-3 ibi 566 aoc <br />