Laserfiche WebLink
Subtask 1.4 - Site Investigation <br />Subtask 1.4.1 Subsurface Investigation <br />Using the preliminary site plan, CDM will perform a subsurface investigation to explore the <br />subsurface soil conditions and to evaluate the limits of waste within the proposed facility <br />location. It is anticipated that soil borings, test pits, and/or piezocones (or a combination of <br />these) will be required to explore the limits of waste and for the foundation design and site <br />preparation of the new convenience center. An allowance for soil borings, test pits, and/or <br />piezocones is provided in this Scope of Services. IRC SWDD will be responsible for excavating <br />the test pits, disposing of the waste, and backfilling the pit with clean soil to full depth. <br />This geotechnical exploration does not include environment/chemical sampling or testing of <br />the materials or groundwater encountered within the site. <br />CDM will prepare a geotechnical report summarizing the results of the subsurface investigation <br />program, including existing geotechnical investigations. This summary will include results of <br />the boring and test logs and results of laboratory classification testing of selected samples. <br />Recommendations for foundation design and site preparation will be included in the report. <br />Any solid waste or undesirable materials discovered within the vicinity of the facility's <br />foundation will need to be excavated and replaced with structural fill by the Contractor during <br />construction of the facility. <br />Subtask 1.4.2 Solid Waste Assessment <br />Under this subtask, CDM will perform an assessment of the existing solid waste (depth of <br />waste, type of waste, need for LFG control, etc.) in the proposed location, surface sweeps for <br />landfill gas, will also be provided. <br />This Scope of <br />Work does not include a <br />traffic study or relocation of the <br />existing access road. It is <br />assumed that <br />the existing road will be <br />used to access <br />the new facility. <br />Subtask 1.5 - Preparation of Design Drawings <br />CDM will prepare permitting/ construction drawings of the proposed improvements which <br />shall show the location, size, and spatial relationships between existing and proposed <br />structures, equipment, and other improvements. CDM will subcontract the architectural, <br />structural, HVAC/Plumbing and landscape/ irrigation design services to John H. Dean <br />Architect & Associates and the electrical design services to Smith Engineering Consultants, Inc. <br />All civil and geotechnical engineering design will be performed by CDM. The level of detail and <br />information to be shown on the drawings shall be in conformance with generally accepted <br />standards of the engineering and construction industry. Drawings shall be prepared using <br />AutoCAD 2005. It is anticipated that the Drawing set will include the following engineering <br />disciplines: <br />■ General (CDM) <br />■ Civil (CDM) <br />■ Structural (John H. Dean Architect & Associates) <br />■ Architectural (John H. Dean Architect & Associates) <br />■ HVAC/Plumbing (John H. Dean Architect & Associates) <br />A-3 ibi 566 doc <br />