My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-094
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2016 9:34:46 AM
Creation date
10/1/2015 12:02:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/18/2008
Control Number
2008-094
Agenda Item Number
14.B.3
Entity Name
Camp Dresser & McKee
Subject
Oslo Customer Convenience Center Work Order No.9
Area
Oslo Custormer Convience Center
Supplemental fields
SmeadsoftID
6941
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ Landscape (John H. Dean Architect & Associates) <br /> ■ Electrical (Smith Engineering Consultants, Inc.) <br /> A preliminary list of drawings is included at the end of this scope. Drawings for improvements <br /> that will be provided in the permit applications will be completed to 90 percent level. Drawings <br /> and specifications for improvements which will be publicly bid will be completed to 100 percent <br /> level. <br /> CDM will submit progress submittals of the Construction Documents at the 30, 60, 90, and 100 <br /> percent completion stages. The number of copies of each progress submittal shall be as <br /> specified below. Following each of the progress submittals, CDM will schedule a meeting with <br /> IRC SWDD staff to review the documents and discuss any comments and/ or questions. <br /> Following this review meeting and receipt of IRC SWDD staff comments on the progress <br /> submittal, CDM shall proceed with design and preparation of the next progress submittal, <br /> addressing IRC SWDD staff comments, and continuing detailed design development. <br /> The 30, 60 and 90 percent submittals shall consist of a set of drawings including a drawing <br /> index, existing site survey, a general site layout drawing, layout plans for each major structure, <br /> design detail development to the respective level, and general construction details. The <br /> Contract Documents submittal shall include draft bidding requirements, contract conditions, <br /> contract forms, and draft technical specifications. Five copies of the 30, 60, and 90 percent <br /> complete documents will be submitted to IRC SWDD. <br /> The 100 percent submittal shall consist of the same materials submitted at the 30, 60, and 90 <br /> percent stages, except that the level of detail of the documents shall be completed to the 100 <br /> percent completion level, including permit conditions/ requirements. CDM will prepare and <br /> deliver ten copies (24" x 36") of the 100 percent design drawings to IRC SWDD. The 100 percent <br /> submittal shall become the Bid Set. <br /> Subtask 1.6- Preparation of Contract Documents <br /> CDM will prepare Contract Documents, utilizing the EJCDC/ CSI format, which will consist of <br /> bidding requirements, contract conditions, contract forms, and written technical descriptions of <br /> materials, equipment, construction systems, standards and workmanship as applied to this <br /> project. <br /> The level of detail and information to be included in the Contract Documents shall be sufficient <br /> to allow competitive bidding of the project from qualified general contractors, and consistent <br /> with generally accepted standards of the engineering and construction industry. <br /> Subask 1.7 - Preparation of Construction Cost Estimate <br /> CDM will prepare an estimate of probable construction cost for work to be performed by a <br /> general contractor. A cost estimate will be prepared at the 60 percent design level and at the 100 <br /> percent design level. <br /> A-4 Ibl566.id c <br />
The URL can be used to link to this page
Your browser does not support the video tag.