Laserfiche WebLink
TASK 2.0 - PERMITTING ASSISTANCE <br />This task consists of the preparation by CDM of necessary permit applications to the various <br />regulatory agencies having jurisdiction over this project. CDM will prepare the following <br />permit applications: <br />■ Florida Department of Environmental Protection (FDEP) Environmental Resource <br />Permit (ERP) Application <br />■ FDEP Notice of Intent (NOI) for Stormwater Discharge during construction <br />■ IRC Major Site Plan Permit <br />■ IRC Stormwater Management System Permit <br />■ IRC Land Clearing Permit <br />■ IRC Tree Removal Permit <br />■ Indian River Farms Water Control District (IRFWCD) Drainage Connection Permit <br />■ FDEP Water Main Extension Permit <br />■ FDEP Solid Waste Notification <br />■ IRC Health Department Septic Tank Permit <br />IRC SWDD will pay all permit application fees. More specifically, this task includes the <br />following subtasks: <br />Subtask 2.1 Pre -application Meetings <br />As part of this subtask, CDM will attend one pre -application meeting with FDEP staff in <br />Orlando, one pre -application meeting with IRC Planning and Zoning Department staff, and one <br />pre -application meeting with IRFWCD staff. <br />Subtask 2.2 Environmental Resource Permitting <br />This subtask includes the stormwater modeling and permit application preparation needed to <br />obtain an environmental resource permit. <br />Subtask 2.2.1 Stormwater Modeling Existing and Proposed Systems <br />In order to understand the existing system and quantify the current outflow to the regional <br />drainage system an existing system stormwater model will be developed. Additionally, to <br />ensure that the proposed drainage system results in acceptable impacts to the regional system a <br />proposed stormwater model will be developed using the existing model as a base. The model <br />will be used both in the design of the proposed stormwater management system, as well as <br />support to obtain the ERP. <br />It is assumed that all of the required data will be available either from IRC or IRFWCD. These <br />data include, but are not limited to the following digital coverages: soils, land use, topography, <br />as well as any current drainage infrastructure that impacts the site. <br />Subtask 2.2.2 Preparation of Environmental Resource Permit Application <br />An ERP is required to permit the modifications required to this site. In addition to the plan set <br />developed in Task 1.5, the ERP application requires information on the site, environmental <br />considerations, including wetland delineations, plans, construction schedule and techniques, <br />A-5 ibl666 doc <br />