My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-094
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2016 9:34:46 AM
Creation date
10/1/2015 12:02:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/18/2008
Control Number
2008-094
Agenda Item Number
14.B.3
Entity Name
Camp Dresser & McKee
Subject
Oslo Customer Convenience Center Work Order No.9
Area
Oslo Custormer Convience Center
Supplemental fields
SmeadsoftID
6941
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 2.0 - PERMITTING ASSISTANCE <br /> This task consists of the preparation by CDM of necessary permit applications to the various <br /> regulatory agencies having jurisdiction over this project. CDM will prepare the following <br /> permit applications: <br /> ■ Florida Department of Environmental Protection (FDEP) Environmental Resource <br /> Permit (ERP) Application <br /> ■ FDEP Notice of Intent (NOI) for Stormwater Discharge during construction <br /> ■ IRC Major Site Plan Permit <br /> ■ IRC Stormwater Management System Permit <br /> ■ IRC Land Clearing Permit <br /> ■ IRC Tree Removal Permit <br /> ■ Indian River Farms Water Control District (IRFWCD) Drainage Connection Permit <br /> ■ FDEP Water Main Extension Permit <br /> ■ FDEP Solid Waste Notification <br /> ■ IRC Health Department Septic Tank Permit <br /> IRC SWDD will pay all permit application fees. More specifically, this task includes the <br /> following subtasks: <br /> Subtask 2.1 Pre-application Meetings <br /> As part of this subtask, CDM will attend one pre-application meeting with FDEP staff in <br /> Orlando, one pre-application meeting with IRC Planning and Zoning Department staff, and one <br /> pre-application meeting with IRFWCD staff. <br /> Subtask 2.2 Environmental Resource Permitting <br /> This subtask includes the stormwater modeling and permit application preparation needed to <br /> obtain an environmental resource permit. <br /> Subtask 2.2.1 Stormwater Modeling Existing and Proposed Systems <br /> In order to understand the existing system and quantify the current outflow to the regional <br /> drainage system an existing system stormwater model will be developed. Additionally, to <br /> ensure that the proposed drainage system results in acceptable impacts to the regional system a <br /> proposed stormwater model will be developed using the existing model as a base. The model <br /> will be used both in the design of the proposed stormwater management system, as well as <br /> support to obtain the ERP. <br /> It is assumed that all of the required data will be available either from IRC or IRFWCD. These <br /> data include, but are not limited to the following digital coverages: soils, land use, topography, <br /> as well as any current drainage infrastructure that impacts the site. <br /> Subtask 2.2.2 Preparation of Environmental Resource Permit Application <br /> An ERP is required to permit the modifications required to this site. In addition to the plan set <br /> developed in Task 1 .5, the ERP application requires information on the site, environmental <br /> considerations, including wetland delineations, plans, construction schedule and techniques, <br /> A-5 ibl666 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.