Laserfiche WebLink
stormwater best management practices (BMPs), drainage information, operations and <br /> maintenance, legal documentation, and water use. <br /> This subtask assumes that there are no or limited environmental impacts to the site. If it is <br /> determined that there are potentially significant environmental impacts, it will be necessary to <br /> submit a separate scope of work and budget to address these concerns. <br /> This subtask includes preparation of the permit application and all supporting information. <br /> This subtask also includes responding to one request for additional information (RAI), with the <br /> understanding that the RAI is merely seeking clarification on submitted information, not <br /> requiring additional analysis. If the permitting agency requests additional analysis, it may be <br /> necessary to submit a separate scope of work to address their concerns. <br /> The Stormwater Pollution Prevention Plan will be included in the Contract Documents in the <br /> form of notations and special design features. CDM shall prepare the NOI for the IRC SW-DD to <br /> execute. <br /> Subtask 2.3 Preparation of IRC Major Site Plan Application <br /> CDM will prepare a request, including supporting documentation, for a Major Site Plan Permit. <br /> The supporting documentation will include the application form, ten copies of the plans, site <br /> aerial, tree removal permit application, land clearing permit application, and stormwater <br /> management system permit application. CDM will attend one technical review committee <br /> (TRC) meeting with the IRC Planning and Zoning Department staff and one Planning and <br /> Zoning Board meeting. <br /> The building permit shall be obtained at a later date by the Contractor constructing the new <br /> Oslo Convenience Center. <br /> Subtask 2.4 Preparation of IRFWCD Permit <br /> The local water management board controls alterations to the existing drainage canal system. A <br /> discharge into the IRFWCD will be required for the stormwater discharge. CDM will prepare <br /> planning level drawings for preliminary submittal to the IRFWCD. These drawings and a <br /> completed IRFWCD application will be submitted to the IRFWCD. <br /> Subtask 2.5 Preparation of the FDEP General Permit for a Water Main Extension <br /> CDM will prepare and submit to the FDEP a Notice of Intent to use a General Permit for a <br /> Water Main Extension and the necessary documentation required to permit the potable water <br /> main. <br /> Subtask 2.6 Preparation of FDEP Solid Waste Notifications <br /> Chapter 62-701 .610(7), Florida Administrative Code (FAC) requires that FDEP be consulted <br /> prior to conducting activities at the closed landfill. It is anticipated that a solid waste permit will <br /> not be required as determined by Chapter 62-701 .710 (e)2, FAC. CDM will consult with FDEP <br /> and prepare and submit any required notifications prior to any onsite activities being <br /> performed including the geotechnical investigation and construction activities. The budget in <br /> this Scope of Services does not include solid waste permitting. If FDEP determines that a solid <br /> A-6 jb1%6.Eoc <br />