Laserfiche WebLink
waste permit is <br />required, an amendment to <br />this Scope of Services will be required to include <br />preparation of a sold waste <br />application. <br />Subtask 2.7 Preparation of the IRC Health Department Septic System Permit <br />Design of this facility will include an operator's restroom facility, which will require an onsite <br />septic system for treatment of wastewater. CDM will prepare and submit to the IRC Health <br />Department the required permit documents to construct the onsite septic system. <br />Subtask 2.8 Responses to Request for Additional Information <br />It is anticipated that the FDEP, IRC Planning and Zoning Department, IRFWCD, and the IRC <br />Health Department may request additional information to evaluate the design and supporting <br />permit application material. CDM's budget provides for preparation of one set of responses for <br />additional information from FDEP (water main extension), IRFWCD (drainage connection <br />permit), and IRC (septic system and site plan) under this task. It is anticipated that this will <br />require about 30 days depending on the number and complexity of the comments. Responses to <br />comments will be in the form of letter reports with attached supplemental information. <br />TASK 3.0 - BIDDING SERVICES <br />In this task, CDM will assist IRC SWDD in obtaining bids for the construction of the project, <br />assist IRC SWDD in evaluating the bids and in assembling and awarding the contract, and will <br />arrange and preside over a prebid and a preconstruction conference. <br />■ CDM will provide 10 sets of drawings and contract documents to IRC SWDD. IRC <br />SWDD will advertise for bids, and provide the documents to prospective bidders. <br />■ CDM will coordinate the advertisement of the bid, respond to the communications <br />from Contractors, and issue addenda, as necessary. CDM will also conduct a pre-bid <br />meeting for interested Contractors. <br />■ CDM will prepare a detailed final opinion of probable cost. <br />■ CDM will attend the bid opening, evaluate bids, and recommend a bidder for <br />Award of Contract to IRC SWDD. <br />■ After issuance of a Notice to Award by IRC SWDD, CDM shall assist IRC SWDD in <br />preparing the construction contract, request and review information from the <br />Contractor, and advise IRC SWDD on finalizing the contract. <br />■ CDM will arrange for a preconstruction conference to be attended by the Contractor, <br />IRC SWDD, other interested parties, and CDM'S representatives. Preconstruction <br />conference minutes will be prepared and distributed to all attendees. The Notice to <br />Proceed will be prepared by CDM for issuance to the Contractor. The bidding phase <br />of the project terminates at the issuance of the Notice to Proceed. <br />TASK 4.0 - PROJECT/ QUALITY MANAGEMENT <br />Activities performed under this task consist of those generally administrative functions <br />required to assure that the project remains on schedule, within budget, and that the quality of <br />the work products defined within this scope is consistent with CDM's standards and IRC <br />SWDD's expectations. Specific activities included are identified below: <br />A-7 Ibl5%doc <br />