Subtask 4.1 Project Update Meetings <br />CDM's project manager will prepare for and attend status reporting meetings throughout the <br />life of the project. It is estimated that meetings will be held on the average of once a month. <br />Subtask 4.2 Quality Control (QC) Technical Review <br />CDM maintains a QC program on all of its projects. Two Technical Review Committee (TRC) <br />meetings have been budgeted for and will be conducted at the 60 and 100 percent completion <br />stages of the project. An IRC SWDD representative will be invited to attend and participate at <br />the TRC meetings. <br />Subtask 4.3 Project Status Reports <br />CDM's project manager will prepare and submit monthly status reports throughout the life of <br />this project. <br />PHASE II - CONSTRUCTION SERVICES <br />TASK 5.0 - GENERAL ENGINEERING SERVICES <br />CDM will provide services during construction for the new Oslo Convenience Center. Under <br />this task, CDM will provide construction services on an as needed basis during construction for <br />the estimated 5 -month construction period (120 days to substantial completion and 150 days to <br />final acceptance). Smith Engineering Consultants, Inc. and John H. Dean Architect & Associates <br />will assist CDM with general engineering services related to the electrical and <br />architectural/ structural work, respectively. General services include contract assembly and <br />execution, contract administration, project progress meetings, periodic site visits, shop drawing <br />review, issue clarifications, review of contractor's pay requests, final inspections, certification of <br />substantial completion, preparation of change orders, and the preparation of record drawings <br />all to be rendered on an as needed basis. <br />Subtask 5.1 Review Substitutes <br />CDM will consult with, advise IRC SWDD, and act as its representative as provided in the <br />General Conditions of the construction contract. Consult with and advise IRC SWDD as to the <br />acceptability of substitute materials and equipment proposed by the Contractor when <br />substitution is permitted by the Contract Documents. <br />Subtask 5.2 Site Visits <br />CDM will make visits to the site at intervals appropriate to the various stages of construction to <br />observe the progress and quality of the executed work of the Contractor and to determine in <br />general if such work is proceeding in accordance with the Contract Documents. During such <br />visits and on the basis of on-site observations, CDM shall keep IRC SWDD informed of the <br />progress of the work, shall endeavor to guard the County against defects and deficiencies in <br />such work and may disapprove or reject work as failing to conform to the Contract Documents. <br />Subtask 5.3 Shop Drawings <br />CDM will review and approve Shop Drawings and samples, the results of tests and inspections <br />and other data which the Contractor is required to submit. <br />A-8 ;b, 5G doe <br />