Laserfiche WebLink
Subtask 4.1 Project Update Meetings <br /> CDM' s project manager will prepare for and attend status reporting meetings throughout the <br /> life of the project. It is estimated that meetings will be held on the average of once a month. <br /> Subtask 4.2 Quality Control (QC) Technical Review <br /> CDM maintains a QC program on all of its projects. Two Technical Review Committee (TRC) <br /> meetings have been budgeted for and will be conducted at the 60 and 100 percent completion <br /> stages of the project. An IRC SWDD representative will be invited to attend and participate at <br /> the TRC meetings. <br /> Subtask 4.3 Project Status Reports <br /> CDM's project manager will prepare and submit monthly status reports throughout the life of <br /> this project. <br /> PHASE II - CONSTRUCTION SERVICES <br /> TASK 5.0 - GENERAL ENGINEERING SERVICES <br /> CDM will provide services during construction for the new Oslo Convenience Center. Under <br /> this task, CDM will provide construction services on an as needed basis during construction for <br /> the estimated 5-month construction period (120 days to substantial completion and 150 days to <br /> final acceptance). Smith Engineering Consultants, Inc. and John H. Dean Architect & Associates <br /> will assist CDM with general engineering services related to the electrical and <br /> architectural/ structural work, respectively. General services include contract assembly and <br /> execution, contract administration, project progress meetings, periodic site visits, shop drawing <br /> review, issue clarifications, review of contractor's pay requests, final inspections, certification of <br /> substantial completion, preparation of change orders, and the preparation of record drawings <br /> all to be rendered on an as needed basis. <br /> Subtask 5.1 Review Substitutes <br /> CDM will consult with, advise IRC SWDD, and act as its representative as provided in the <br /> General Conditions of the construction contract. Consult with and advise IRC SWDD as to the <br /> acceptability of substitute materials and equipment proposed by the Contractor when <br /> substitution is permitted by the Contract Documents. <br /> Subtask 5.2 Site Visits <br /> CDM will make visits to the site at intervals appropriate to the various stages of construction to <br /> observe the progress and quality of the executed work of the Contractor and to determine in <br /> general if such work is proceeding in accordance with the Contract Documents. During such <br /> visits and on the basis of on-site observations, CDM shall keep IRC SWDD informed of the <br /> progress of the work, shall endeavor to guard the County against defects and deficiencies in <br /> such work and may disapprove or reject work as failing to conform to the Contract Documents. <br /> Subtask 5.3 Shop Drawings <br /> CDM will review and approve Shop Drawings and samples, the results of tests and inspections <br /> and other data which the Contractor is required to submit. <br /> A-8 ;b, 5G doe <br />