My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-038
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2016 3:36:43 PM
Creation date
9/30/2015 6:21:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/11/2003
Control Number
2003-038
Agenda Item Number
11.G.1.
Entity Name
Carter Associates, Inc.
Subject
Installation of tilting Weir Gates-Work Order No.2
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3160
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for all four gate locations . The cost for coordinating with the geotechnical engineering firm <br /> and performing the necessary structural engineering analyses to determine if any or all of the <br /> four existing concrete structures require stiffening, will be included in this Work Order. <br /> C . Construction Drawings — Prepare the necessary construction drawings so that the <br /> project can be properly bid and constructed by a general contractor. The Plan View Scale <br /> shall be 1 /8th" to 3 /8th" = V -0" and the Elevation View/Section View Scale shall be <br /> 1 /8th" to 3/8th" = V -0" . No text shall be less than 1 /8 " high. After IRFWCD has <br /> approved the ENGINEER ' s final construction drawings , provide the following : <br /> 1 . Reproducible Construction Drawings (24-inch x 36-inch vellum) — one set to <br /> IRFWCD <br /> 2 . Electronic copy of the drawings in AutoCad format (Release 12 or later) on 3 . 5 -inch <br /> or CD -R disks — one set to IRFWCD and one set to COUNTY . <br /> 3 . Blueprints — two sets to COUNTY , signed and sealed . <br /> D . Technical Specifications <br /> 1 . Prepare all Technical Specifications necessary for the Contractor to properly <br /> construct the project. The overshoot gate specifications shall be based on draft <br /> specifications provided to the ENGINEER by David Gunter of IRFWCD and they <br /> shall be written around an Armtec gate. The gate specifications shall accurately <br /> describe in detail, the type of overshoot gate desired by IRFWCD and all desired <br /> appurtenances thereto . The specifications shall state that other "equivalent" or "or- <br /> equal" overshoot gates may be used, but any structural modifications required to the <br /> bidding documents to accommodate the "equivalent" or "or-equal" gate , shall be <br /> included in the bid price , and the associated construction drawings and calculations <br /> shall be signed and sealed by a Florida registered professional engineer. On or before <br /> the 90 percent review meeting, provide the COUNTY and IRFWCD with one <br /> hardcopy each, of all technical specifications for review . Technical Specifications <br /> shall meet the following minimum formatting criteria : <br /> a. Microsoft Word Format <br /> b . Aerial font, size 12 <br /> C * full justification. <br /> 2 . Revise the Technical Specifications as requested by IRFWCD . After IRFWCD has <br /> approved the Technical Specifications, provide both the COUNTY and IRFWCD <br /> with one signed and sealed hard copy of the Technical Specifications , and with one <br /> electronic copy on 3 . 5 -inch or CD — R disks . <br /> E . Bidding Documents and Construction Contract Documents — Using the standard <br /> EJCDC bidding and construction contract documents as a guide, prepare bidding <br /> documents and construction contract documents for the Work. IRFWCD will bid the <br /> project . On or before the 90 percent review meeting, provide the COUNTY and <br /> IRFWCD with one hardcopy each, of all bidding documents and construction contract <br /> documents for review. Revise the documents as requested by IRFWCD . After IRFWCD <br /> has approved the documents , provide both the COUNTY and IRFWCD with one signed <br /> and sealed hard copy, and with one electronic copy on 3 . 5 -inch or CD — R disks . <br /> F:\Public Works\KeithM\Stcrmwater Projects\East IRC\Contracts\Consultant Contract with Carter & Associates\Wcrk Order No. 2 - Replacement <br /> of Radial Arm Gates\Work Order No. 2 - Latest Revision.doc 3 <br /> EAST INDIAN RIVER COUNTY MASTER STORMWATER MANAGEMENT PLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.