Laserfiche WebLink
L. Proiect Close-Out Services- At the end of construction, provide project close-out services . <br /> These services include, but are not limited to , preparation of final punchlist(s) , review and <br /> approval of the constructed Works , review and approval of the Contractor ' s final pay request, <br /> review and approval of project record drawings . Prepare "As-Built" drawings from <br /> „ Contractor' s record drawings and shop drawings . Distribution of "As-Builts" shall be as <br /> follows : <br /> 1 . Reproducible Construction Drawings (24-inch x 36 -inch vellum) — one set to <br /> IRFWCD . <br /> 2 . Electronic copy of the drawings in AutoCad format on 3 . 5 -inch or CD -R disks — one <br /> set to IRFWCD and one set to COUNTY . <br /> 3 . Blueprints — one set to COUNTY . <br /> SECTION IV - TIME FOR COMPLETION <br /> After the COUNTY issues a written authorization to proceed, ninety (90) calendar days <br /> shall be allowed for completion of Items III. B , C , D , E, F , and G. The remainder of the Scope of <br /> Services shall be as scheduled by IRFWCD . <br /> SECTION V - COMPENSATION <br /> The COUNTY agrees to pay, and the ENGINEER agrees to accept, a fee for services <br /> rendered according to the "Scope of Services Provided by the ENGINEER," identified in Section <br /> III of this WORK ORDER, with a maximum charge under this WORK ORDER of $ 65 , 085 . <br /> This maximum fee is itemized as follows : <br /> TABLE V- 1 — MAXIMUM COMPENSATION SCHEDULE <br /> Task Description ENGINEER' s <br /> Compensation <br /> 1 Engineering Design Services and Surveying Services $ 20 , 600 . 00 <br /> 2 Construction Drawings $ 11 , 850 . 00 <br /> 3 Technical Specifications $ 39000 . 00 <br /> 4 Bidding Documents and Construction Contract Documents $ 39930 . 00 <br /> 5 Engineer' s Opinion of Construction Cost $ 1 , 570 . 00 <br /> 6 Project Meetings <br /> 6 . a Meeting No . 1 — Coordination Meetin $400 . 00 <br /> 6 .b Meeting No . 2 — 30% Review Meeting $ 400 . 00 <br /> 6 . c Meeting No . 3 — 60% Review Meeting $ 400 . 00 <br /> 6 . d Meeting No . 4 — 90% Review Meeting $400 . 00 <br /> 7 Pre-Bid Meeting $ 540 . 00 <br /> 8 Assistance During Bidding $ 25640 . 00 <br /> 9 Bid Analysis and Recommendation of Award $ 19305 . 00 <br /> 10 Construction Services and Part-Time Construction Observation <br /> F :\Public Works\KeithM\Stcrmwater Projects\East IRC\Contracts\Cmsultant Contract with Carter & Associates\Work Order No. 2 - Replacement <br /> of Radial Arm Gates\Work Order No. 2 - Latest Revision.doc 5 <br /> EAST INDIAN RIVER COUNTY MASTER STORMWATER MANAGEMENT PLAN <br />