Laserfiche WebLink
ATTACHMENT 3 <br /> TECHNICAL SPECIFICATIONS PREPARED BY <br /> INDIAN RIVER COUNTY <br /> WORK ORDER No . 5 <br /> FINAL DESIGN SERVICES AND CONSTRUCTION MANAGEMENT <br /> SERVICES FOR POLLUTION CONTROL SYSTEMS IN THE MAIN <br /> RELIEF CANAL ,THE SOUTH RELIEF CANAL , AND <br /> THE NORTH RELIEF CANAL <br /> A. TECHNICAL SPECIFICATIONS PREPARED BY THE COUNTY <br /> Indian River County will prepare the following technical specifications , as pertinent : <br /> DIVISION 1 = GENERAL REQUIREMENTS <br /> 01009 Special Provisions <br /> 01010 Summary of Work <br /> 01014 Maintenance of Operations <br /> 01025 Measurement and Payment <br /> 01026 Schedule of Values <br /> 01040 Project Coordination <br /> 01045 Cutting and Patching <br /> 01050 Surveying and Field Engineering Services <br /> 01091 Reference Standards <br /> 01092 Abbreviations and Symbols <br /> 01210 Pre-Construction Conference <br /> 01215 General Quality Control <br /> 01220 Progress Meetings <br /> 01310 Construction Schedule <br /> 01330 Required Submittals <br /> 01340 Submittal of Shop Drawings , Product Data , and Samples <br /> 01342 Installation Data <br /> 01380 Construction Photographs <br /> 01382 Construction Videos <br /> 01410 Testing Laboratory Services <br /> 01520 Construction Facilities and Temporary Controls <br /> 01541 Protection of the Work and Property <br /> 01542 Operations in Highway Rights-of-Way <br /> 01543 Maintenance and Protection of Traffic <br /> 01550 Access Roads and Parking Areas <br /> 01592 Contractor' s Field Office <br /> 01610 Transportation and Handling of Material and Equipment <br /> FAPublic Works\KeithM\Stormwater Projects\East IRC\Contracts\Consultant Contract with Carter & Associates\Work Order No . 5 - Final Design <br /> of Vortex System\Work Order #5 - Rev. May 3, 2004.doc <br /> 17 <br />