My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-112
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2016 11:51:09 AM
Creation date
9/30/2015 7:34:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/11/2004
Control Number
2004-112
Agenda Item Number
11.I.2
Entity Name
Carter Associates
Subject
Work Order No.5
Final design services Stormwater Pollution Control System
Area
Main Relief, South Relief, and North Relief Canal
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3770
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
View images
View plain text
01611 Storage of Material and Equipment <br /> 01620 Installation of Equipment <br /> 01630 Substitutes and " Or- Equals" <br /> 01655 Starting and Placing Equipment in Operation <br /> 01660 Field Tests of Equipment <br /> 01710 Site Cleanup and Restoration <br /> 01720 Record Drawings <br /> 01730 Operation and Maintenance Data <br /> 01750 Spare Parts and Maintenance Materials <br /> 01810 Project Closeout <br /> 01820 Post- Final Inspection <br /> 01830 Bonds and Equipment Warranties <br /> *** END OF ATTACHMENT 3*** <br /> FAPublic Works\KeithM\Stormwater ProjectsTast IRC\Contracts\Consultant Contract with Carter & Associates\Work Order No. 5 - Final Design <br /> of Vortex System\Work Order #5 - Rev. May 3 , 2004.doc <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).