My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-112
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2016 11:51:09 AM
Creation date
9/30/2015 7:34:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/11/2004
Control Number
2004-112
Agenda Item Number
11.I.2
Entity Name
Carter Associates
Subject
Work Order No.5
Final design services Stormwater Pollution Control System
Area
Main Relief, South Relief, and North Relief Canal
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3770
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a . Main Relief Canal : Eastern limits = 400 feet east of the proposed <br /> tilting weir structure or 50 feet west of the railroad bridge , whichever is <br /> the shortest distance . Western Limits = 50 feet east of the spillway . <br /> b . South Relief Canal : Eastern Limits = 400 feet east of the proposed <br /> tilting weir structure . Western Limits = the Old Dixie Highway Bridge . <br /> ( Indian River County has existing survey information in the vicinity of <br /> the Old Dixie Highway Bridge , and the COUNTY will provide this <br /> information to the ENGINEER . ) <br /> c . North Relief Canal β Eastern Limits = 50 feet west of the U . S . <br /> Highway No . 1 bridge . Western Limits = 50 feet east of the Old Dixie <br /> Highway bridge . <br /> 9 . Existing Planimetric Features β Locate and identify all visible , above <br /> ground physical features and objects within the Limits of Survey , and show <br /> this information on the Topography Drawings . Planimetric features include , <br /> but are not limited to : existing and established Survey Control , pavement , dirt <br /> trails or roads , driveways , sidewalks , curbs , bridges , structures , valve boxes , <br /> hydrants , poles , towers , overhead wires , manholes , mailboxes , fences , <br /> plantings , drainage structures , water bodies , edge of wooded areas , trees 3,, <br /> inches or larger in diameter within the canal right-of-ways (and identify the <br /> size (diameter) and species of each tree ) , signs , etc . Also , show the <br /> extension of the centerline of the City Municipal Airport' s runway on the plan <br /> view . <br /> D . ENGINEERING SERVICES βThe design team shall provide the following services <br /> so that the Work described herein can be permitted by applicable federal , state , and <br /> local regulatory agencies , properly bid by the COUNTY , and constructed by a <br /> Contractor selected by the COUNTY : <br /> 1 . Final Engineering Design and Calculations β The design team shall <br /> design a pollution control system for ( 1 ) the Main Relief Canal , (2 ) the South <br /> Relief Canal , and ( 3 ) the North Relief Canal as discussed and recommended <br /> in the approved Preliminary Engineering Report . In general , each pollution <br /> control system shall include a floating boom system , three or more climber <br /> screens , and two or more vortex units . The floating boom system directs <br /> floating debris in the canal to the climber screens . The canal water will flow <br /> through the climber screens into an animal removal chamber, and then into a <br /> main channel that routes the canal water into the vortex treatment units . <br /> Design the floating boom to rise and fall with the canal water level . Canal <br /> water level shall be regulated by a tilting weir. Design the tilting weir to <br /> provide the necessary operational head for optimum operation of the vortex <br /> units throughout their design flow range . Design the entire system for <br /> continuous and automatic operation . <br /> FAPublic Works\KeithM\Stormwater ProjectsTast IRC\Contracts\Consultant Contract with Carter & Associates\Work Order No. 5 - Final Design <br /> of Vortex System\Work Order #5 - Rev. May 3, 2004.doc <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.