Laserfiche WebLink
EXHIBIT ` 1 ' <br /> SCOPE OF WORK <br /> WORK ORDER NO . 1 <br /> It is our understanding that the project will consist of a force main extension along 16` ' Street <br /> from the Old Savannah Subdivision east to 43 �d Avenue (2 , 300± lineal feet) , north along 44°i <br /> Avenue from 16th Street to State Road 60 (2 , 600± lineal feet) , and south along 43 "d Avenue from <br /> 16 `h Street to 12th Street (2 , 600± lineal feet) . <br /> The following describes our proposed scope of work and terms of agreement between Carter <br /> Associates , Inc . (CONSULTANT) and Indian River County Department of Utility Services <br /> (COUNTY) . <br /> Task 1 - Design Survey : CONSULTANT will perform surveying services for the project site to <br /> include the following : <br /> 1 . A Specific Purpose Survey will be prepared by a licensed and registered Florida <br /> Professional Surveyor and Mapper which meets the minimum technical standards set <br /> forth by the Florida Board of Professional Surveyors and Mappers in Chapter 61G17 , <br /> Florida Administrative Code pursuant to Section 472 . 027 , Florida Statutes . <br /> 2 . Above ground topographic information will be referenced to the National Geodetic <br /> Vertical Datum of 1929 . Topographic data will be obtained on 10046ot intervals , or <br /> equivalent , along the proposed construction route within the existing rights-of-way. <br /> Cross - sections and other pertinent information will be obtained as needed for design of <br /> proposed force main extension . <br /> Task 2- Construction Plans and Specifications : CONSULTANT will prepare plan and profile <br /> drawings , detail sheets , and technical specifications for the proposed force main extension . <br /> Task 3 - Permitting : CONSULTANT will prepare and submit applications and required exhibits <br /> toward obtaining the following permits : <br /> 1 . Department of Environmental Protection <br /> a . Wastewater Collection Permit <br /> 2 . Indian River County <br /> a . Land Clearing / Tree Removal Permits <br /> 5V/z6/o , <br /> c . Right-of- Way Permit <br /> CONSULTANT will generally confer with permitting agencies staff and maintain contact with <br /> staff to expedite receipt of permits . <br /> Task 4 - Construction Administration : CONSULTANT will prepare a contract for <br /> construction, including bidding requirements , general conditions , technical specifications , and <br /> Page 2 of 6 <br />