project location plans in sufficient detail to define the scope and requirements for the proposed <br /> utility construction . CONSULTANT will assist COUNTY in bidding the project by selling <br /> plans and attending pre- bid and post- bid meetings , and by addressing contractor questions and <br /> requests for clarifications regarding construction of utilities . CONSULTANT will review and <br /> approve shop drawings/submittals from contractors . <br /> CONSULTANT will conduct routine site inspections over the duration of the construction <br /> period (approximately four ( 4) months) to verify that the work is proceeding in accordance with <br /> the plans and specifications and to verify contractor ' s pay requests . CONSULTANT will <br /> conduct a final walk-through inspection and prepare a punch list . CONSULTANT will verify the <br /> completion of final punch list items . <br /> Task 5 - "As - Built" Survey : Final certifications will require an "as -built" survey meeting the <br /> requirements of the permitting agencies . The "as- built" survey is not an independent survey <br /> drawing of "as -built" conditions but is the collection of "as-built" data in the field which is in <br /> turn superimposed on the engineering drawings . The " as - built" survey is limited to the minimum <br /> amount of information necessary to provide final certifications to permitting agencies listed <br /> under Task 3 , Permitting . <br /> Task 6 — Certifications and Close-out Documents : CONSULTANT will provide final <br /> certifications of the work to FDEP and Indian River County . CONSULTANT will complete the <br /> Indian River County sewer checklist and submit along with required attachments <br /> ENGINEERING ASSUMPTIONS : <br /> In developing this proposal , CONSULTANT represents to the COUNTY that the following <br /> assumptions have been made and that deviation from these assumptions may require additional <br /> expenditures on behalf of the COUNTY to CONSULTANT . <br /> I . All permitting, application , impact and testing fees are not included and will be paid for by <br /> the COUNTY separately . <br /> 2 . This sizing of the force main will be coordinated with the COUNTY and verified by the <br /> CONSULTANT . <br /> 3 . Construction staking is not included with this proposal . <br /> Page 3 46 <br />