My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-237
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-237
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2016 12:05:13 PM
Creation date
10/1/2015 3:50:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/08/2009
Control Number
2009-237
Agenda Item Number
12.J.3
Entity Name
Carter Associates
Subject
Work Order No.1 43rd Avenue Widening and Drainage Improvements
Area
16th St. to 43rd Ave. 44th Ave. 16th St. to SR 60 16th St. 12th
Project Number
9601
Supplemental fields
SmeadsoftID
10788
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
project location plans in sufficient detail to define the scope and requirements for the proposed <br /> utility construction . CONSULTANT will assist COUNTY in bidding the project by selling <br /> plans and attending pre- bid and post- bid meetings , and by addressing contractor questions and <br /> requests for clarifications regarding construction of utilities . CONSULTANT will review and <br /> approve shop drawings/submittals from contractors . <br /> CONSULTANT will conduct routine site inspections over the duration of the construction <br /> period (approximately four ( 4) months) to verify that the work is proceeding in accordance with <br /> the plans and specifications and to verify contractor ' s pay requests . CONSULTANT will <br /> conduct a final walk-through inspection and prepare a punch list . CONSULTANT will verify the <br /> completion of final punch list items . <br /> Task 5 - "As - Built" Survey : Final certifications will require an "as -built" survey meeting the <br /> requirements of the permitting agencies . The "as- built" survey is not an independent survey <br /> drawing of "as -built" conditions but is the collection of "as-built" data in the field which is in <br /> turn superimposed on the engineering drawings . The " as - built" survey is limited to the minimum <br /> amount of information necessary to provide final certifications to permitting agencies listed <br /> under Task 3 , Permitting . <br /> Task 6 — Certifications and Close-out Documents : CONSULTANT will provide final <br /> certifications of the work to FDEP and Indian River County . CONSULTANT will complete the <br /> Indian River County sewer checklist and submit along with required attachments <br /> ENGINEERING ASSUMPTIONS : <br /> In developing this proposal , CONSULTANT represents to the COUNTY that the following <br /> assumptions have been made and that deviation from these assumptions may require additional <br /> expenditures on behalf of the COUNTY to CONSULTANT . <br /> I . All permitting, application , impact and testing fees are not included and will be paid for by <br /> the COUNTY separately . <br /> 2 . This sizing of the force main will be coordinated with the COUNTY and verified by the <br /> CONSULTANT . <br /> 3 . Construction staking is not included with this proposal . <br /> Page 3 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.