Laserfiche WebLink
MOB , Page 1 11 / 17/2008 <br /> EXHIBIT B <br /> 43rd Ave Roadway Improvements Project <br /> 8th Street to 18th Street <br /> Right-of-Way Mapping <br /> Length +/- 1 . 4 miles <br /> IRC Project No . 0858 <br /> Contract 0725 <br /> INDIAN RIVER COUNTY RIGHT OF WAY MAP CHECKLIST <br /> All Right-of-way projects shall adhere to Chapter 177 & 472 , F . S . and Chapter 61G17 , F .A. C . as <br /> minimum and be certified as such . R/W Maps shall be prepared/submitted in the form of a certified <br /> R/W Map will all applicable certifications and criteria met. <br /> Items are to be check off and form submitted with review submittals <br /> Submittal (Order Number) I . E , One of One , Two of Two <br /> Date : By : <br /> ❑ Cover sheet/Key sheet . (To be supplied by IRC in DWG . ) <br /> ❑ Survey notes and report sheet . <br /> ❑ Key sheet(s) <br /> ❑ Survey Control sheet . <br /> ❑ Subsequent R/W map sheets . <br /> ❑ A separate Table of Ownerships sheet depicting the following : <br /> o Parcel Number matching map sheets — in numerical order <br /> o Recording Data <br /> ❑ Supply a Box or area for county acceptance and/or certification OR if for recording as <br /> per standard cover sheet provided . <br /> ❑ Title Box of each sheet must contain : <br /> o County <br /> o State Road and/or County Road Number <br /> o Designed , drawn and checked by (use names or initials) & date <br /> o Scale <br /> o Field Book References <br /> o Sheet Numbers to be in numerical order ( 1 , 21 31 4 , etc . ) NOT ( 1 , 1A , 1 B , 2 , etc . ) <br /> ❑ Any notes necessary to set out the type and/or purpose of the map shall be shown . <br /> ❑ Provide in survey notes - all relevant resources to prepare the Right-of-Way map . <br /> ❑ Show pertinent dimensions and bearings in the following fashion as the case may be : <br /> o Plat — ( P) <br /> o Computed — ( C) <br /> o Field — ( F) <br /> o Deed ( D) <br /> ❑ Parcels shall have a parcel identification number in numerical order corresponding with <br /> the Table of Ownership . <br /> ❑ Show stations and offsets to all Right of Way Breaks , bends , PC ' s , PT' s , block corners <br /> ( per plat) . <br /> ❑ Show stations , deflection (or bearing ) of all intersecting section , '/4 section lines to <br /> baseline (either field or calculated as applicable) . <br /> ❑ Show monumented baselines and all references thereto . <br /> ❑ Verify that computed distances and bearings are supported by field measurements . <br /> ❑ Verify and/or monument significant elements of Baseline alignment shown . ( i . e . curves , <br /> bearings and P . I . Stations) <br /> F :\Engineering\Capital Projects\0725- 2007 Annual Prof. Survey Contract\2007-2008 Projects\Carter\WO 16-43rd Ave 8th to 18th- <br /> OrMAI RAamIlAin%A 'I M Avn AIh_ 1 Rhh Q} dmer4ur PnIAI Groin.i rhnr4 lief Gy 91 19_9_(1A rim^ <br />