My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-259(a-b)
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-259(a-b)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:18:20 AM
Creation date
9/30/2015 11:01:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Certificate
Approved Date
07/26/2007
Control Number
2007-259(a-b)
Agenda Item Number
county administrator signature
Entity Name
Turner Construction
Subject
IRC Emergency Operations Center - Punch List
Area
4225 43rd Ave.
Project Number
5054.18
Supplemental fields
SmeadsoftID
6484
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ID200 7. <br /> -ID <br /> D O N A D I O <br /> & Associates, Architects, P. A. <br /> TO: LOU FIORE TURNER CONSTRUCTION <br /> STEVE BLUM INDIAN RIVER COUNTY <br /> LYNN WILLIAMS INDIAN RIVER COUNTY <br /> TOM FRAME INDIAN RIVER COUNTY <br /> JIM LEVERONI DONADIO AND ASSOCIATES <br /> FROM: ANTHONY J. DONADIO, AIA, NCARB <br /> DONADIO & ASSOCIATES, ARCHITECTS, P.A. <br /> DATE: FRIDAY - JULY 6, 2007 <br /> ISSUE DATE: SUNDAY —JULY 089 2007 <br /> PROJECT NO. 5054.18 <br /> REGARDING: INDIAN RIVER COUNTY EMERGENCY OPERATIONS CENTER <br /> EXTERIOR BUILDING PUNCH LIST <br /> TIME: 2: 00 P.M. <br /> WEATHER: SUNNY & HUMID <br /> EOC Exterior Building Punch List <br /> East Elevation <br /> 1 . Main entrance doors leading into the front Lobby top right corner needs to be re-caulked, paint finish is <br /> chipped and caulking. <br /> 2 . Threshold at main entrance door needs to be caulked where it abuts the concrete. <br /> 3 . Sides of main entrance doors at the strike side and the outside edges need to be repainted. <br /> 4. Covered entrance concrete sidewalk needs to be cleaned of stain, dirt and debris, etc. <br /> 5 . To the right of the front entrance door concrete slab and sidewalk has paint on it needs to be cleaned. <br /> 6. Covered entry area wall opposite the front entrance doors need to be repainted. <br /> 7. Covered entry area wall opposite the front entrance doors, the south and north inside corners have dirt and <br /> debris in it and also smudges on the wall. <br /> 8 . Front entrance covered entry metal drip edge needs to be cleaned of paint and tar on the north and south sides <br /> where it abuts the building and front face. <br /> 9. Front left south corner of the metal drip edge, caulking needs to be removed from the bottom edge. <br /> 10. North face of the covered entry , the left bottom panel needs to be repainted and the right middle panel needs <br /> to be repainted, smudge marks and white paint on the panel. <br /> RECENED <br /> 609 17'h Street Vero Beach, Florida 32960 Phone 772 794 2929 Fax 772 562 8600 JUL 2 '� 200 1 7 <br /> Email daa@donadio-arch.com License No. AA0002238 <br /> TURNER <br />
The URL can be used to link to this page
Your browser does not support the video tag.