My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-259(a-b)
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-259(a-b)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:18:20 AM
Creation date
9/30/2015 11:01:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Certificate
Approved Date
07/26/2007
Control Number
2007-259(a-b)
Agenda Item Number
county administrator signature
Entity Name
Turner Construction
Subject
IRC Emergency Operations Center - Punch List
Area
4225 43rd Ave.
Project Number
5054.18
Supplemental fields
SmeadsoftID
6484
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Emergency Operations Center <br /> Exterior Building Punch List - Friday - 07/06/07 <br /> July 08, 2007 <br /> Page 4 <br /> GENERAL NOTES: <br /> 1 . All spacers at the ceramic accent tile need to be removed. <br /> 2 . All ceramic accent tiles, the edges of the tile need to be painted to match the adjacent surface color. <br /> 3. Pre-cast panel reveal around the perimeter of the accent tile do not have the finish coat of paint on it. Paint <br /> needs to be applied. Just the primer on the panel at this time. That occurs at numerous locations. <br /> 4 . All joints at the tilt up panels, the caulked joints and the reveal joints, edges of the recess do not have <br /> sufficient coats of finished paint. <br /> 5. Perimeter of accent tile on the building needs to be caulked, that is the void between the backside of the tile <br /> and the concrete panel, prior to being painted. <br /> 6. All metal drip edges on the covered entry areas and the main building, need to have any bleed over from the <br /> tar and paint removed from the finish. <br /> 7 . All exterior walls need to be touched-up with paint where there is dirt, scratches, etc . on all four elevations <br /> where this occurs. <br /> 8. All exterior door thresholds need to be caulked where they abut the concrete sidewalk. <br /> 9. All concrete entry pads leading into all exterior doors needs to be cleaned of dirt, debris and paint. <br /> 10. Aluminum gates at the Satellite Farm and dumpster enclosures finish is unacceptable. Panel faces of the <br /> gates, have been ground in certain areas giving the panels a uneven finished look. Not acceptable. <br /> 11 . Provide verification of exterior coating finish millage meets manufactures specifications, Some areas paint <br /> finish seem thin . <br /> END OF EXTERIOR BUILDING PUNCH LIST FOR EMERGENCY OPERATIONS CENTER , <br /> D O N A D I O <br /> & Associates, Architects , P.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.