My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-259(a-b)
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-259(a-b)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:18:20 AM
Creation date
9/30/2015 11:01:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Certificate
Approved Date
07/26/2007
Control Number
2007-259(a-b)
Agenda Item Number
county administrator signature
Entity Name
Turner Construction
Subject
IRC Emergency Operations Center - Punch List
Area
4225 43rd Ave.
Project Number
5054.18
Supplemental fields
SmeadsoftID
6484
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Emergency Operations Center <br /> Exterior Building Punch List - Friday - 07/06/07 <br /> July 08, 2007 <br /> Page 3 <br /> West Elevation (continued) <br /> 3 . West exterior , top track for the impact screen needs to be caulked where it abuts the pre-cast panel . <br /> 4. Precast panel joint above the southernmost window on the west elevation, insufficient finish inside the joint, <br /> paint finish needs to be redone. <br /> 5 . Exterior door leading into the Mechanical Room off the Equipment enclosed area, threshold needs to be <br /> caulked where it abuts the concrete slab. <br /> 6. Penetrations thru the west exterior wall at the Equipment enclosure for Electrical, A/C , etc. this needs to be <br /> sealed. Electrical conduit, at main service panel, going into the building has not been sealed where it <br /> penetrates, that is the same also for small electrical conduit to the right of the automatic transfer switch. <br /> 7. Inside screen wall opposite the Emergency Generator, joint between pre-cast panels is very rough and <br /> irregular, not uniform. Exposed edges of concrete need to be painted. <br /> 8. Back wall A/C enclosure opposite the Emergency Generator there is void in the gravel area underneath the <br /> panel, needs to be filled in. <br /> 9. South end of the Emergency Generator gravel area appears to have more dirt than gravel, this needs to be <br /> cleaned and leveled, insufficient thickness of gravel. Need more gravel installed so that no dirt comes through <br /> or is visible. <br /> 10. Recess above pair of doors leading into from the enclosed Equipment area, between the transfer switch and <br /> the light, has not been painted, needs to be painted. <br /> 11 . Outside west face of the Equipment enclosure, center of sodded area wet soil just, at the edge of the pavement <br /> need to check and see if no lines are broken or if this is condensate area. <br /> 12. North end of west elevation, near the Utility Main, two conduits projecting out of the pre-cast panel above <br /> grade are left open , if these are not being used they need to be closed off. <br /> North Elevation <br /> 1 . First panel off the west corner of the north elevation, center panel finish is irregular, needs to be patched and <br /> repaired. Also, in this same area at the west corner of the north elevation, finish is damaged on the bottom <br /> panel, needs to be patched and repaired. <br /> 2. Western most covered entry area outside face the north face accent color needs to be cut in properly to the <br /> reveal joints. <br /> 3 . Inside West covered entry on the north face, steel angles needs to be caulked where they abut the concrete and <br /> repainted. <br /> 4. Inside West covered entry, left and right inside corners of the panel opposite the entrance door and also the <br /> right and left panels adjacent to the entrance door need to be repainted. That includes the right and left inside <br /> corners. <br /> 5 . North Elevation, Center covered entry, area inside corners opposite the door and on right and left sides of the <br /> doors need to be repainted. <br /> 6. North Elevation, Center covered entry, clip angles needs to be caulked where they abut the concrete. <br /> 7 . Tilt up Panel below the hose bibb needs to be cleaned of dirt and debris. <br /> 8 . Tilt-up panel to the left of the exterior intake grille , imperfection in the panel, this needs to seen if this can <br /> taken care of with the paint finish. <br /> 9. East covered entry on the north elevation; clip angles needs to be caulked where they abut the panel and <br /> repainted. <br /> 10. Right side East covered entry on the north elevation, above opening leading into exterior entry door alcove, <br /> pre-cast panel has been damaged needs to be patched and repaired. Also, true in this same area where the <br /> ceiling and the wall panel meet, needs to be re-caulked. <br /> 11 . Left and right panels and left and right inside corners adjacent to the easternmost exterior entrance door on the <br /> north elevation need to be repainted. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.