My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-259(a-b)
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-259(a-b)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:18:20 AM
Creation date
9/30/2015 11:01:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Certificate
Approved Date
07/26/2007
Control Number
2007-259(a-b)
Agenda Item Number
county administrator signature
Entity Name
Turner Construction
Subject
IRC Emergency Operations Center - Punch List
Area
4225 43rd Ave.
Project Number
5054.18
Supplemental fields
SmeadsoftID
6484
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, I <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br /> TO: LOU FIORE TURNER CONSTRUCTION <br /> STEVE BLUM INDIAN RIVER COUNTY <br /> LYNN WILLIAMS INDIAN RIVER COUNTY <br /> TOM FRAME INDIAN RIVER COUNTY <br /> JIM LEVERONI DONADIO AND ASSOCIATES <br /> FROM: ANTHONY J. DONADIO, AIA, NCARB <br /> DONADIO & ASSOCIATES, ARCHITECTS, P.A. <br /> DATE: TUESDAY - JUNE 12, 2007 <br /> ISSUE DATE: JUNE 229 2007 <br /> PROJECT NO, 5054.18 <br /> REGARDING: INDIAN RIVER COUNTY EMERGENCY OPERATIONS CENTER <br /> INTERIOR PUNCH LIST <br /> TIME: 1 : 30 P.M. <br /> WEATHER: OVERCAST/ WINDY <br /> Lobby 001 <br /> 1 . Exterior Door 001 — Threshold needs to be cleaned of dirt and debris. <br /> 2. Weather stripping needs to be secured tighter at the floor area. <br /> 3 . Lobby area needs to be cleaned of dirt and debris at the tile floor. <br /> 4. To the left of exterior Door 001 fingerprints on the wall need to be touched up with paint. <br /> 5 . North wall underneath the pass-thru window, drywall needs to be repainted where it has been touched-up . <br /> 6. Pass-thru window needs to have sill track installed and secured in place. <br /> 7 . Underside of countertop pass-thru steel angle needs to be painted to match the wall at the bottom of the <br /> countertop. Also, any openings or gaps in the steel angle need to be caulked. <br /> 8. Pass-thru window needs to be cleaned of dirt and debris and aluminum frame caulked where it abuts the <br /> drywall opening. <br /> 9. Aluminum head for the pass-thru window needs to be cleaned of drywall mud and the speaker panel in the <br /> window needs to be set plumb, evidently the louvers are on an angle. <br /> 10. Metal door frame 068 needs to be repainted at the edges where it has been chipped with paint. <br /> 60917th Street Vero Beach, Florida 32960 Phone 772 794 2929 Fax 772 562 8600 RECEIVED <br /> Email dm@donadio-arch.com License No . AA0002238 ' JUL 2 4 <br /> 2007 <br /> TURNER 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.