My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-259(a-b)
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-259(a-b)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:18:20 AM
Creation date
9/30/2015 11:01:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Certificate
Approved Date
07/26/2007
Control Number
2007-259(a-b)
Agenda Item Number
county administrator signature
Entity Name
Turner Construction
Subject
IRC Emergency Operations Center - Punch List
Area
4225 43rd Ave.
Project Number
5054.18
Supplemental fields
SmeadsoftID
6484
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
View images
View plain text
Indian River County Emergency Operations Center <br /> Interior Punch List - Tuesday - 06/ 12/07 <br /> June 22, 2007 <br /> Page 2 <br /> Lobby 001 (continued) <br /> 11 . West wall electrical outlet opening cut too large, drywall needs to be patched and repaired and outlet cover <br /> plate needs to be set flush. That is also true of the TV outlet on this same wall . <br /> 12. South corner of the west wall needs to be touched-up with paint where it has been chipped. Also in this area <br /> there is a scratch in the drywall. Also, on the south side of the return to the right of door 003A there is a <br /> bump in the drywall approximately 18 " off the floor at that outside corner. <br /> 13 . Doors 003A — Hollow metal frame needs to be touched-up with paint at the edges where it has been chipped. <br /> Also, in side face of door at the middle hinge scratch in the door needs to be fixed/repaired . Door does not <br /> latch properly into the strike. <br /> 14. To the left of Door 003A escutcheon plate needs to be installed on the plumbing clean-out. <br /> 15. South wall just to the right of the door stop for Door 002 needs to be touched-up with paint, there are marks <br /> on the wall. <br /> 16. Drywall to the right of door frame 0002 is pulled away from the metal frame, needs to be patched and <br /> repaired up on the top right of the top hinge. Also, where the drywall abuts 002 door frame needs to be <br /> sanded and repainted. <br /> 17 . To the right of Door 001 drywall corner is chipped around the complete perimeter of the door, needs to be <br /> patched, repaired and repainted. <br /> 18. Drywall above Door 001 just below the exit light fingerprints on the drywall need to be repainted . <br /> 19. Ceiling tile missing above Door 003A. <br /> 20. Ceiling grid along the east wall above and to the right of exterior Door 001 , the main grid and the cross <br /> ceiling tee need to be set flush to the grid, they are uneven at this time. <br /> 21 . Ceiling grid to the top left of Door 001 is bent, that is the 3r1 ceiling grid off the north wall and the I " full <br /> ceiling tile off the east wall . <br /> 22. Ceiling grid off the main runner grid in front of Door 003A, 3rd grid perpendicular to the door is bent needs to <br /> be repaired. <br /> 23. All walls in this area need to be cleaned of drywall dust. <br /> 24. Top of ceramic tile base needs to be cleaned of dirt, debris and also paint overspray of the complete perimeter <br /> of the room. <br /> 25. Ceramic tile base to the right of Door 003A, inside corner is very irregular, the tile does not set flush to the <br /> wall, this needs to be corrected. <br /> Restroom 002 <br /> 1 . Wood door 002 needs to be cleaned of dirt and debris. Also, top left on the inside face glue on the door needs <br /> to be cleaned. <br /> 2. Floor drain cover needs to be cleaned of tape, grout, etc. <br /> 3 . All plumbing accessories need to be cleaned of protective film. <br /> 4. Ceramic tile needs to be cleaned of paint, dirt and debris in numerous areas. <br /> 5 . Top edge of 2x 6 ceramic rile trim needs to be cleaned of paint around the complete perimeter where it abuts <br /> the drywall, top edge. <br /> 6. Drywall above Door 002 where it abuts the metal frame, the door head needs to be sanded and repainted. <br /> 7 . Ceramic tile floor needs to be cleaned of dirt and debris. <br /> 8. Ceramic tile base to the right or to the east of the toilet fixtures , water closet voids at the grout joint between <br /> the floor and ceramic the base directly under the toilet paper holder. <br /> 9. Caulking at the wall hung lavatory and ceramic the on the right side is not done neatly needs to be redone. <br /> Rough and irregular. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).