My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-259(a-b)
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-259(a-b)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:18:20 AM
Creation date
9/30/2015 11:01:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Certificate
Approved Date
07/26/2007
Control Number
2007-259(a-b)
Agenda Item Number
county administrator signature
Entity Name
Turner Construction
Subject
IRC Emergency Operations Center - Punch List
Area
4225 43rd Ave.
Project Number
5054.18
Supplemental fields
SmeadsoftID
6484
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Emergency Operations Center <br /> Interior Punch List - Tuesday - 06/12/07 <br /> June 22, 2007 <br /> Page 3 <br /> Media Production Room 003 <br /> 1 . Left of Door 003A drywall needs to be sanded and repainted, irregular areas. <br /> 2. North wall to the left of the electrical outlet dirt mark on the wall needs to be sanded and repainted. <br /> 3. West wall, the short wall off of Door 003A, outside corner, fingerprints need to be repainted. <br /> 4. North wall a little bit to the right of the westernmost electrical outlet fingerprints on the wall basically <br /> between the 2 electrical outlets need to be repainted . <br /> 5 . Door 003A hollow metal door frame needs to be touched-up with paint where it has been chipped in <br /> numerous areas. Also, metal frame for the view light needs to be repainted at the screw head locations and <br /> areas where paint has been chipped or peeling off. <br /> 6. Drywall to the left of door frame 003B needs to be re-sanded and repainted. Un-sufficient coats of paint and <br /> irregularity in the drywall. <br /> 7. Drywall around light switch to the left of Door 003B opening cut too large, needs to be patched and repaired. <br /> 8 . Borrowed light BL4 drywall underneath the hollow metal frame at the bottom left comer and to the left of the <br /> jamb needs to be sanded and repainted, drywall is irregular. <br /> 9. Electrical outlet below borrowed light 4, drywall is irregular, needs to be patched and repaired around <br /> electrical outlet cover. <br /> 10. Borrowed light BU drywall needs to be patched and repaired on the bottom left and right comers there are <br /> voids in the frame. Also, bottom edge of the hollow metal frame paint irregular need to be sanded and <br /> repainted that is also typical of borrowed light #4. <br /> 11 . South wall below the borrowed light BL2 marks in the drywall need to be patched and repaired. <br /> 12. South wall easternmost electrical outlet drywall needs to be patched and repaired, irregular drywall around the <br /> perimeter. <br /> 13. Carper tiles in numerous locations near the door jambs and in the corners carpet tile is buckled up not setting <br /> flush to the floor. All joints need be set flush, replace. <br /> 14. All screws in the borrowed lights heads need to be painted to match the frame color. <br /> 15. Ceiling grid is bent, that is the ceiling grid to the top right of Door 003A, the 4" & 5d' ceiling grid off the <br /> north wall and V full tile off the east wall. <br /> 16. Ceiling tile missing off the east wall . <br /> 17. Ceiling tile damaged that, 2nd full tile off the east wall and 5th' full tile off the north wall, comer is chipped. <br /> 18 . Ceiling grid off the southeast corner of the west wall marks on the grid need to be cleaned. <br /> 19. Ceiling grid the 7ih grid off of Door 003B , red marks on the grid need to be cleaned. <br /> 20. Door 003E does not have any locksets installed. <br /> Computer Room 004 <br /> 1 . Transition between carpet and raised flooring needs to he looked at, area is not tight and secure, this is the <br /> vinyl finished raised floor. <br /> 2. No vinyl base or base installed at the perimeter of the access flooring. <br /> 3. Cable work is still being done in this room. Room has not been cleaned yet. <br /> 4. Walls need to be touched-up with paint in numerous locations of fingerprints and scuff marks. <br /> 5 . All access floor tiles need to be set flush and level . <br /> 6. All penetrations to the acoustical ceiling needs to be cut in a neat flashing and escutcheon put around the <br /> openings . Right now they are all cut very irregular. <br /> 7 . North wall towards the west end above the electrical panel, the ceiling grid is missing. <br /> 8. Ceiling grid above the electrical panel on the east wall , grid is cut due to the conduit coming out of the panel. <br /> This needs to be done in a clean and neat fashion. Not acceptable. <br /> 9. In this same area ceiling grid to the right of the electrical panel on the east wall needs to be repainted or <br /> replaced, glue on the grid. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.