Period Ending: August 31 , 2006
<br /> Central Region Waste Water Treatment Plant Expansion Estimate No.: Twenty-one (21 ) - Final
<br /> Indian River County Bid No: 7029 Date: December 31 , 2006
<br /> Indian River CountyFlorida Partial Completion Date: N/A
<br /> Indian River Industrial Contractors Substantial Completion Date: 7/31/2006
<br /> P. 0. BOX 23086 Contract Compl. Date: 7/31/2006
<br /> Jacksonville, FL 32241-3086
<br /> WORK COMPLETED
<br /> TOTAL THIS VALUE VALUE
<br /> DESCRIPTION QUANTITY UNIT COST VALUE PREVIOUS ESTIMATE TOTAL COMPLETED UNCOMPLETED
<br /> DIVISION 5 - METALS
<br /> 1. Miscellaneous Metals 1 LS 155,000.00 155,000.00 100% 0% 100% 155,000.00 0.00
<br /> 2. Metals - Filter Festoon Supports 1 LS 5,500.00 5,500.00 100% 0% 100% 5,500.00 0.00
<br /> 3. Metals - Grit Classifier Chute 1 LS 8,500.00 8,500.00 100% 0% 100% 8,500.00 0.00
<br /> DIVISION 9 - COATINGS & FINISHES
<br /> 1. Painting 1 LS 10,000.00 10,000.00 100% 0% 100% 10,000.00 0.00
<br /> DIVISION 10 - SIGNAGE SYSTEMS
<br /> 1. Signage (Chemical / Non-Potable) 1 LS 500.00 500.00 100% 0% 100% 500.00 0.00
<br /> DIVISION 11 - EOUIPMENT
<br /> 1. Automatic Backwash Filters 1 LS 325,000.00 325,000.00 100% 0% 100% 325,000.00 0.00
<br /> 2. Algae Sweeps @ Clarifier No. 3 1 LS 143,000.00 143,000.00 100% 0% 100% 143,000.00 0.00
<br /> 3. Gates and Weir Plates 1 LS 10,000.00 10,000.00 100% 0% 100% 10,000.00 0.00
<br /> 4. Vertical Turbine Pump 1 LS 65,000.00 65,000.00 100% 0% 100% 65,000.00 0.00
<br /> 5. RAS & WAS Pumps 1 LS 110,000.00 110,000.00 100% 0% 100% 110,000.00 0.00
<br /> 7. Valves 1 LS 40,000.00 40,000.00 100% 0% 100% 40,000.00 0.00
<br /> 8. Clarifiers (Walker) 1 LS 305,000.00 305,000.00 100% 0% 100% 305,000.00 0.00
<br /> 9. Parkson Screen (Mack Col 1 LS 127,000.00 127,000.00 100% 0% 100% 127,000.00 0.00
<br /> 10. Wemco Hydrogritter (EKP) 1 LS 49,800.00 49,800.00 100% 0% 100% 49,800.00 0.00
<br /> 11. Pista Grit (Smkh and Loveless) 1 LS 68,000.00 68,000.00 100% 0% 100% 68,000.00 0.00
<br /> 12. Envirex Scum Trough (Heyward) 1 LS 22,800.00 22,800.00 100% 0% 100% 22,800.00 0.00
<br /> 13. Chemical Feed System (Guardian) 1 LS 156,000.00 156,000.00 100% 0% 1000/0 156,000.00 0.00
<br /> 7. Sample Pump & Sump Pumps 1 LS 1,750.00 1,750.00 100% 0% 100% 1,750.00 0.00
<br /> DIVISION 1 - SPECIAL CONSTRUCTION & INSTRUMENTATION
<br /> 1. Kruger Controls and Instrumentation 1 LS 208,500.00 208,500.00 100% 0% 100% 208,500.00 0.00
<br /> Page 4Totals 1,811,350.00 1,811,350.00 0.00