My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-062
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2016 2:02:01 PM
Creation date
9/30/2015 10:36:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
02/13/2007
Control Number
2007-062
Agenda Item Number
11.J.1
Entity Name
Sheltra and Son Construction Inc.
Subject
Change Order No.1 West Wabasso Water Lines
Supplemental fields
SmeadsoftID
6135
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reason for change order: The Contract drawings specified extending 160 LF of 4" PVC <br /> to provide water services for seven homes into an area that was not properly platted. This <br /> extension was designed to minimize the long service lines that were needed to reach these <br /> homes . However, upon installation of this water main it was determined that the location <br /> at which this pipe ended was not in a suitable location and that it did not adequately serve <br /> the purpose for minimizing the long service line. Therefore, an additional 120 LF of 4" <br /> PVC water main was needed in which the shorter service lines provide a better water <br /> pressure to the house. <br /> CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME <br /> Original Contract Price Original Contract Times <br /> $_ 575,000. 00 Substantial Completion: March 27,2007 <br /> Ready for final payment: April 27,2007 <br /> Days or dates <br /> Net changes from previous Change Orders Net change from previous Change Orders <br /> No. 0 to No. 0 No. 0 to No. 0 <br /> $ -0- <br /> -0- days <br /> Contract Price prior to this Change Order Contract Time prior to this Change Order <br /> $ 575,000.00 Substantial Completion: March 27,2007 <br /> Ready for final payment: April 27,2007 <br /> Days or dates <br /> Net Increase (decrease) in this Change Order Net Increase in this Change Order <br /> $ 30,370. 00 <br /> days <br /> Contract Price with all approved Change Contract Time with all approved Change <br /> Orders Orders <br /> $ 605 .370. 00 Substantial Completion: <br /> Ready for final payment: <br /> Days or dates <br /> RECOMMENDED : APPROVED : ACCEP ED : <br /> By: <br /> By: r � B <br /> Engineer (Authorized Signature) Own (* ho zed Si at e) ontractor (Authorized <br /> Signature) —1 GaryC .., Jhes er ; B C C�iairman <br /> Date: I — 30 — D ! Date: _ 02 / 13 /07 Date: <br /> EJCDC No. C-700 (2002 Edition) <br /> Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated <br /> General Contractors of America. <br />
The URL can be used to link to this page
Your browser does not support the video tag.