My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-117
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2016 2:20:57 PM
Creation date
9/30/2015 10:41:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/03/2007
Control Number
2007-117
Agenda Item Number
11.J.3
Entity Name
The Danella Companies
Subject
Change Order #1 Utility Conflict Resolutions
CR 512 Phase III Roadway Improvements
Area
CR 512 and CR 512
Supplemental fields
SmeadsoftID
6240
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Department of Utilities <br /> DEDUCTIONS ( ADDITIONS <br /> COS'1' EJLIMATE and CONTRACTOR'S BID ITEM LIST Attachment <br /> Project: CR 512 Phase III Roadway Improvements - Revised Jul 21, 3006 <br /> Description: Utilit Relocations <br /> 31-Jul-06 LABOR COSTS <br /> Bid Bid Item _ Estimated Unit of Labor Unit Total Labor <br /> Item No. Descri tion Quandt Measure Price 7-Price <br /> 5b Install 6" HDPE Open Cut 36.0 1 LF $80.001 1 $2,880.00 <br /> 17o Install G" NRS Resilient Stated Gale Valve 1 FA $395.00 $395.00 <br /> 7x Install Mechanical Restrain[ Join[ on Existing 6" Main 2.0 EA $333 .00 $666.00 i <br /> r <br /> 23 Test Holes/Potholes 2 EA $200.00 $400.00 ' <br /> _- -- <br /> 09 Make Connection to Existing Main 1 .0 EA $795.00 $795.00 <br /> 6 Install Mech. Restrained Joint DIP Fittings 0.25 Tn $ 1 665 . _00 $416.25 C ( - <br /> Bid Item U-23 - Valve Potable Water 8" Gale I EA <br /> ! _ <br /> 17d R" Gate Valve Complete 1 NA $420.00 $420.00 <br /> Bid Item I1-24 - Valve Potable Water 12" Gate 3 EA <br /> 17f Install 12" NRS Gate Valve & Box 3 EA $545.00 $ 1 ,635 .00 <br /> Note^ (2) 12" gate valves were already included in U-20 <br /> Bid Item U-25 Potable Water Main Adjustment <br /> _ Assembly 6" <br /> C � ) <br /> I EA <br /> tMechanicalcY F <br /> 00 $ I00.00 <br /> OG Install Restrained Joint Fittings 0.25 UN $ 1 ,665. $416.25 <br /> I <br /> nts <br /> EA $333.00 <br /> 6,00 <br /> p7) Install Mechanical Make Connection t Restrained <br /> nJto th on <br /> Existing <br /> 3" 8" Main 2?0 EA $795.00 $ $660.00 <br /> 23 Test Holes/Potholes 2 EA $200.001 $400.00 <br /> Btd Item U 26 Potable Water Main Adjustment Assembly 12 <br /> DIP (include (4) 45 Bend) 4 EA <br /> OSe Install 12" HDPE by Open Gut 104.0 LF $95.00 $9,880.00 <br /> OG Install Mechanical Restrained Joint Fittings 2.60 1 O $ 1 ,665.00 $4,329.00 <br /> _ 7b Install Mechanical Restraint Joint on Existing 10'-12" Main 8.0 EA $500.00 $4,000.00 _ 1 - <br /> 09 Make Connection to Existing Main 8.0 EA $795.00 $6,360.00 <br /> Test Holes Potholes _- - - <br /> 23 8 8A $200.00 $ 1600.00 <br /> Bid Ilan U-27 Potable Water Main Adjustment Assembly 16" <br /> _ DIP (include (4) 45 Bend) I EA <br /> 05tInstall 16" HDPE by Open Cut 26.0 LF $100.00 $2,600.00 -$2,800.00 <br /> _ 06 Install Mechanical Restrained Joint Fittings 1 .06 TON $ 1 ,065 .00 $ 1 ,704.90 -$1 ,764.90 <br /> --_ ._- .-- <br /> 7c Install Mechanical Restraint Joint on Existing I6" Main 2.0 EA $550.00 $ 1 , 100.00 -$1 , 700.00 <br /> 09 Make Connection to Existing Main 2.0 FA $795 .00 $ 1 ,590.00 -$1 ,590.00 ( <br /> 23 Test holes/Potholes 2 EA $200.00 $400.00 -$400.00 _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.