Laserfiche WebLink
Indian River County Department of Utilities <br /> DEDUCTIONS ADDITIONS <br /> _ COST ESTIMATE and CONTRACTOR'S Bill 1'1'EM LIST' Attachment <br /> **�nL. m „ * <br /> Pro'ect: <br /> CH 512 Phase III Roadway Improvements - Revised July 21, 2006 A 1, L 1. 11111 111. <br /> Description: Utility Relocations <br /> 31-Jul-06 LABOR COSTS <br /> Rid Bid Item Estimated Unit of Labor Unit Total Labor <br /> Item No. Description Quandt Measure Price Price <br /> Bid Item U-19 - Potable Water Main 12" DIY 216 LF <br /> g <br /> _ - _._.. . <br /> train t Joint on Exi <br /> 3 ,990.00 <br /> 703 Install Mechanical <br /> ake Cest Hol s/Potholes Existing <br /> ,0'-12" Main 1110 EA $795.00 $795.00 EA $200.00 $ $200 00 r $200.00 ADDITIONA THOLES I <br /> 2d Install 12" DIP Water Main 2160 LF $ 18.50 $3,996.00 <br /> L PO REQUIRED <br /> Bid Item U-20 - Polable Water Main 12" HDYF. (Directional 1 ,150 LF i <br /> 04c Install 12" HUPF. Horizontal Directional Drill 1 , 150.0 LF $32.00 $36,800.00 _ <br /> 06 _ . ec <br /> Install Mechanical Restrained Joint Fittings 0.65 TON $ 1 ,665.00 $ t ,082.25 <br /> 7b Install Mechanical Restraint Joint on Existing 10'-12" Main 4.0 EA $500.00 $2,000.00 - . <br /> _ ._ <br /> 09 Make Connection to Existing Juniper <br /> 2.0 EA $79500 $ $460.00 <br /> 10 Install 'temporary Water Main Jum er 1 EA $460.00 $460.00 i <br /> 17f Install 12" NRS Gate Valve & Box 2 EA $545.00 $1 ,090.00 _ <br /> 216 Insta112" Air Release Valve with ARV Manhole & Structure 2 EA $560.00 $1 , 120.00 <br /> 23 _ _ Test I loles/Potholes 10 EA $200.00 $2,000.00 <br /> 256 Install Permanent Blow-off 1 EA $700.00 $700.00 <br /> 28 Install Sample Point 2 EA $85.00 $ 170.00 + _ - - - <br /> Bid Item U-21 - Fire Hydrant Assembly I EAI <br /> ZOb Install hire Hydrant Assembly with tee and 6" Gate Valve I EA $775.00 $775.00 <br /> Y Y - y_. <br /> Bid Item U-22 - Fire Hydrant Assembly Relocation I _ EA <br /> 20a Relocate Fire Hydrant Assembly with lee and 6" Gate Valve 4 EA $416.00 $ 1 ,064.00 -$ 7 ,664.00THIS ITEM REPLACED BY <br /> ______FOLLOWING U-22 ITEMS <br /> U-22 Offset Fire Hydrant and Move to Back of ROW' sta.#274+00 - - - <br /> Install 6" <br /> 051h <br /> _ - -. Y Restrained 816" <br /> g _ r. _ _THESE_ L CONTRACT AN IN <br /> 7c Install06 lMeclhanical Restrat Join onJExistinoint ti1G"' Main 0240 EA 25 TON $ 1$55000 $ , 10000 IN ORIGINA? ITEMSARE <br /> NOD ARE <br /> _- - ____ r - <br /> 09 _ Make Connection <br /> Existing Main 1 .0 EA $795 .00 $795 .00 T <br /> Holes/Potholes23 2 EA $200.00 $400.00 ADDITIONS TO THE ORIGINAL <br /> _ _ _ $395 .00 <br /> 17c Install 6" NRS Resilient Seated Cate Valve 1 EA $395 00 - <br /> 52 Install and compact select fill from outside sources 90.0 CY $30 00 $2,700.00 CONTRACT - <br /> 54 _ Removal and disposal of muck 90.0 CY $ 1100 $990.00 <br /> BUT SHOWN HERE AS INSTALLED <br /> U-22 Blue Island Street Fire hydrant relocate stag 308+$p 1 <br /> 56 Install G" HDPE Open Cu[ 41 .0 LF $80.00 _ r $3,280 00 AND ADDITIONS l <br /> _ 7a Install Mechanical Restraint loin[ on Existing 6" Main 2.0 _ EA $333 .00 $666.00 I <br /> 09 Make Connection to Existing Main 2.0 FA $795 .00 $ 1 ,590.00 <br /> _ 23 Test Holes/Potholes 2 EA $200.00 T $400.00 <br /> Install Mech. Restrained Joint DIP Fittings $416.25 - - - _ - - - - <br /> G g 0.25 To $ 1665 .00 _ � <br /> 75a Wellpoint dewatering min 3000 work area 1 I 'S $ 1 ,300.00 $ 1 ,300.00 - . . . <br /> 756 Wellpoint dewatering additional points required 52.0 LF $25 .00 <br /> 54 Removal and disposal of muck 1800 CY $ 11 .00 _ _ _ $ 1 ,980 00 - <br /> -__ P $5,400 00 <br /> 52 Install and compact select GII from outside sources 180.0 CY $30.00 _ <br /> 1122 Offset Fire Hydrant & Relocate to ROW sta.N265+20 <br />