My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-402
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 12:36:49 PM
Creation date
9/30/2015 11:28:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
11/20/2007
Control Number
2007-402
Agenda Item Number
11.J.1
Entity Name
Sheltra and Son Construction
Subject
Change Order No.2 West Wabasso Phase I
Water Lines
Area
West Wabasso
Project Number
UCP 2447
Supplemental fields
SmeadsoftID
6698
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br /> No. 2 <br /> PROJECT West Wabasso Phase I Water Lines <br /> DATE OF ISSUANCE EFFECTIVE DATE <br /> OWNER Indian River Countv <br /> OWNER' s Contract No . Project No . UCP-2447 <br /> CONTRACTOR: Sheltra and Son Construction Inc. <br /> ENGINEER Indian River Countv/Himanshu Mehta <br /> You are directed to make the following changes in the Contract Documents : <br /> Item # 1 Description : <br /> Deduct 504 LF of 6 " PVC water main at a unit price of 522 .00 (Total -$ 11 ,088 . 00) <br /> Total ($ 11 ,088.00) <br /> Reason for change order: <br /> Linear footage of pipe required was less than originally estimated. <br /> Item #2 Description : <br /> Add 1 Fire Hydrant Gate Valve and Box at a unit price of $3 , 500 - 00 (Total $ 3 ,500. 00) <br /> Total $ 3,500.00 <br /> Reason for change order: <br /> One ( 1 ) additional fire hydrant was required to properly cover service area per plans and <br /> specifications . <br /> Item #3 Description : <br /> Add 4, 1 " PE Single Short Water Service at a unit price of S600. 00 each <br /> (Total 52 ,400. 00) <br /> Total $ 2,400.00 <br /> Reason for change order: <br /> Field adjustment of meter locations required four (4) additional short water services. <br /> Item #4 Description: <br /> Add 5 , 1 " PE Single Lonp Water Service at a unit price of $700. 00 each <br /> (Total 53 , 500. 00) <br /> Total $ 3,500.00 <br /> Reason for change order: <br /> Field adjustment of meter locations required five (5 ) additional single long water services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.