My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-402
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 12:36:49 PM
Creation date
9/30/2015 11:28:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
11/20/2007
Control Number
2007-402
Agenda Item Number
11.J.1
Entity Name
Sheltra and Son Construction
Subject
Change Order No.2 West Wabasso Phase I
Water Lines
Area
West Wabasso
Project Number
UCP 2447
Supplemental fields
SmeadsoftID
6698
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Item #5 Description : <br /> Add 2, 1 . 5 " PE Double Short Water Service at a unit price of $800. 00 each <br /> (Total $ 1 ,600. 00) <br /> Total $ 1 ,600.00 <br /> Reason for change order: <br /> Field adjustment of meter locations required two (2) additional double short water services. <br /> Item #6 Description : <br /> Deduct 13 , 1 . 5" PE Double Lon¢ Water Service at a unit price of $900. 00 each <br /> (Total $- 11 , 700. 00) <br /> Total ($ 11 ,700.00) <br /> Reason for change order: <br /> Field adjustment of meter locations result in the deletion of thirteen (13) double long water <br /> services resulting in additions to above line items 3 -5 . <br /> Item #7 Description : <br /> Deduct 3 , 6" Gate Valves and Boxes at a unit price of $ 1 ,000. 00 each (Total -$ 3 , 000 . 00) <br /> Total ($ 31000.00) <br /> Reason for change order: <br /> Quantity of 6" gate valves required was less than originally estimated. <br /> Item #8 Description : <br /> Deduct 1 . 5 TN Fittings at a price of $ 5 ,000. 00 each (Total -$ 79500. 00) <br /> Total ($ 7,500.00) <br /> Reason for change order: <br /> The total allotted fitting tonnage was not required to complete the project. <br /> Item #9 Description : <br /> Deduct 29 County Connection Fee at a price of $ 155 . 00 each (Total -$ 4,495 .00) <br /> Total ($ 4,495.00) <br /> Reason for change order: <br /> Fifty (50) connection fees required total; bid specifications included seventy-nine ( 79) connection <br /> fees. <br /> Item # 10 Description: <br /> Deduct 22 Pressure Tests at a price of $250 . 00 each (Total -$ 52500. 00) <br /> Total ($ 5,500.00) <br /> Reason for change order: <br /> Fifty-seven (57) pressure tests performed total ; bid specifications included seventy-nine (79) <br /> pressure tests. <br />
The URL can be used to link to this page
Your browser does not support the video tag.